Search

found 92 results

Articles, UC QuakeStudies

A plan which aims to ensure the SCIRT programme complies with set specifications, design and industry quality standards. The first version of this plan was produced on 20 July 2011.

Images, UC QuakeStudies

A photograph of the Hororata Hotel, which was damaged in the 4 September earthquake. A sign outside the hotel reads, "This is not the Hororata Pub. Private residence. No parking. No thoroughfare".

Articles, UC QuakeStudies

A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.

Articles, UC QuakeStudies

A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.

Images, UC QuakeStudies

A photograph of the repaired Kaiapoi River footbridge, also known as Mandeville Bridge. This photograph was modelled off an image taken by a staff member from the Department of Civil and Natural Resources Engineering at the University of Canterbury in September 2010.