BeckerFraserPhotos September 2010 photograph 107
Images, UC QuakeStudies
A machine pumps sewage into the river in Kaiapoi. This is a temporary solution while the sewage system is being repaired.
A machine pumps sewage into the river in Kaiapoi. This is a temporary solution while the sewage system is being repaired.
Sewage continues to be pumped into the river while the damaged sewerage system is repaired.
A photograph of a portaloo outside a property on Gayhurst Road. Many parts of Christchurch were cut off from water after the September earthquake and had to use portaloos until the sewage system was fixed.