Search

found 118 results

Videos, UC QuakeStudies

A video about the restoration of New Regent Street. The restoration is hoped to be completed in time for the Christmas shopping season. The project is being led by Edward Leeson of Naylor Love, who is also managing the restoration of the Isaac Theatre Royal next door.

Images, UC QuakeStudies

A digitally manipulated image of furniture and machinery. The photographer comments, "This furniture restoration company got caught in the middle of the Christchurch earthquake and lost a whole wall. After constant exposure to the elements everything now needs a bit of restoration. They are now working in a different part of Christchurch, but their past can still be seen".

Videos, UC QuakeStudies

A video about the restoration of New Regent Street. New Regent Street was damaged during the 22 February 2011 earthquake. The video includes an interview with Edward Leeson, manager of the restoration project.

Videos, UC QuakeStudies

A video of interviews with members of the public about which option they prefer for the restoration of the ChristChurch Cathedral. The options considered are those unveiled by the Anglican Church: the restoration option which would restore the current cathedral; the traditional option which would reinterpret the original cathedral in modern materials; and the contemporary option which would create a new building featuring a lightweight timber frame, more glazing, and modern interiors.

Videos, UC QuakeStudies

A video of an interview with Arts Centre CEO Andre Lovatt about the restoration of the Arts Centre after the 22 February 2011 earthquake. The video also includes a tour of the Arts Centre, including the Boys' High School swimming pool and gymnasium which was exposed after another building was demolished.

Videos, UC QuakeStudies

A video about the restoration of the dome of the Isaac Theatre Royal. The video includes an interview with Vanessa Carswell, Associate at Warren and Mahoney, about the dimensions of the dome. Because the dome is not a perfect circle, the dome and the canvas that cover it have to be reinstalled in exactly the same way, and the dimensions have to be measured accurately so that the new steelwork fits correctly. The video also includes an interview with art restorer Carolina Izzo about restoring the canvas covering of the dome. Izzo says that the theatre lights have burnt the edges of the canvas, and some patches have been affected by mould. She also explains the process for cleaning the artwork.