Human Resources Management Plan
Articles, UC QuakeStudies
A plan which outlines SCIRT's approach to Human Resource Management. The first version of this plan was produced on 30 August 2011.
A plan which outlines SCIRT's approach to Human Resource Management. The first version of this plan was produced on 30 August 2011.
A plan which aims to ensure the SCIRT programme complies with set specifications, design and industry quality standards. The first version of this plan was produced on 20 July 2011.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
A document that outlines how timely and accurate information relating to estimating, actual project costs, future commitments, and total forecast cost, will be managed and reported for each project phase in the programme.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
A copy of Empowered Christchurch's submission on CERA's Draft Transition Recovery Plan, Greater Christchurch Earthquake Recovery: transition to regeneration.
A research project which presents the traffic and transport planning that has been undertaken to achieve the overarching goal of rebuilding Christchurch, whilst keeping the traffic moving.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "CCC Long Term Plan Update".
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "Christchurch Recovery Plan - have your say".
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "Submissions to Long Term Plan 2015".
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "OVTRK submission on the Transition to Regeneration Plan now ready".
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "Transition to Regeneration Plan - Have Your Say!". Note that video material originally included on the page has been removed for display reasons.
A runsheet created for the initial SCIRT and New Zealand Red Cross collaboration workshop.
A revised memorandum of understanding that sets out how SCIRT and Connexis planned to work together to build an industry training framework and skilled workforce.
A photograph of the former site of Westende Jewellers and Alva Rados, on the corner of Manchester Street and Worcester Street. The building was badly-damaged in the 4 September earthquake and was demolished soon afterwards. A two-storey building was built on the site and completed in July 2012. The building then had to be removed when the decision was made to widen Manchester Street as part of the draft transport plan for central Christchurch. The photograph was modelled after an image taken by Ian McGregor from Fairfax Media in September 2010.
A photograph of the former site of Westende Jewellers and Alva Rados, on the corner of Manchester Street and Worcester Street. The building was badly-damaged in the 4 September earthquake and was demolished soon afterwards. A two-storey building was built on the site and completed in July 2012. The building then had to be removed when the decision was made to widen Manchester Street as part of the draft transport plan for central Christchurch. The photograph was modelled after an image taken by Ian McGregor from Fairfax Media in September 2010.
A tool, including an outline, resources and a survey sheet, used by SCIRT's Transport Planning Manager when delivering a series of toolboxes to SCIRT traffic staff about working around businesses.