BeckerFraserPhotos March 2013 photograph 099
Images, UC QuakeStudies
An aerial photograph of Kilmore Street with a new medical facility under construction.
An aerial photograph of Kilmore Street with a new medical facility under construction.
A video of an interview with Chris Bartholomeusz, Construction Manager at Downer Construction, about the work the team has been doing to stabilise a former quarry on Gleaning Spur. More than 12,000 cubic metres of soil have been removed from the hillside in order to remove a risk of a landslide hitting the houses below.
A new building under construction on Kilmore Street. A sign reading, 'Danger keep out' has been placed on the security fence.
Page 3 of Section A of the Christchurch Press, published on Tuesday 21 May 2013.
A PDF copy of pages 144-145 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'WikiHouse Prototype'. Photos with permission: Wikihouse through Creative Commons
A video of an interview with Julia Morison, a Christchurch-based artist, about her sculptures in a vacant site on the Christchurch central city. The artwork, titled 'Tree Houses for Swamp Dwellers', took over a year to make and will act as a centrepiece for the Scape Public Art festival, which begins on 27 September 2013. The sculpture was designed to provide a playground for children and a shady spot for workers on their lunch breaks. Morison also talks about how the sculpture was designed to be relocated and reconfigured so that it can be moved to a new location when construction begins on the vacant site.