Photograph captioned by BeckerFraserPhotos, "New construction starts at 75 Manchester Street".
Page 4 of Section A of the Christchurch Press, published on Saturday 18 August 2012.
Page 3 of Section C of the Christchurch Press, published on Saturday 15 September 2012.
A photograph captioned by BeckerFraserPhotos, "The new car park on Colombo Street between Tuam and Lichfield Streets, with flower beds and new trees".
Page 1 of Section A of the South Island edition of the Christchurch Press, published on Wednesday 27 June 2012.
Page 2 of Section A of the Christchurch edition of the Christchurch Press, published on Thursday 9 August 2012.
A photograph captioned by BeckerFraserPhotos, "Workers laying a new footpath outside 540 Colombo Street".
A photograph captioned by BeckerFraserPhotos, "A new front being built on 514 Colombo Street".
A photograph captioned by BeckerFraserPhotos, "Concrete being poured in a new building in Colombo Street".
A video of architect Shigeru Ban overseeing the construction of the cardboard beams which will be used to build the Transitional Cathedral on Hereford Street. The video includes an interview with Ban about the beams, and the ways that the design has changed since the construction started.
A video of an interview with Wendy Rushworth, whose house was fenced off despite not being scheduled for demolition. Falcon Construction accidently added Rushworth's property to a list of homes ready for demolition. The company has since apologised to Rushworth and removed the fencing.
A photograph of a concrete mixer. The photograph is captioned by BeckerFraserPhotos, "The old and the new in Colombo Street".
Page 2 of Section A of the Christchurch Press, published on Tuesday 26 June 2012.
Photograph captioned by BeckerFraserPhotos, "New construction of residential units at the Linwood Village, 402 Worcester Street".
A photograph of a partially-constructed building. The photograph is captioned by BeckerFraserPhotos, "Rebuilding, Salisbury Street".
Page 4 of Section A of the Christchurch Press, published on Tuesday 11 December 2012.
A photograph captioned by BeckerFraserPhotos, "A new building replacing a damaged and demolished historic hotel at 192 Moorhouse Avenue".
A photograph captioned by BeckerFraserPhotos, "The site of the demolished Piko Cafe, now operating just from the new piece on the left. Corner of Kilmore and Barbadoes Streets".
A photograph captioned by BeckerFraserPhotos, "Brick cladding covering up concrete slab - strong and attractive! Montreal Street".
Page 3 of Section A of the Christchurch Press, published on Saturday 20 October 2012.
Page 1 of Section A of the Christchurch Press, published on Saturday 15 September 2012.
Page 2 of Section C of the Christchurch Press, published on Saturday 15 September 2012.
Page 16 of Section A of the Christchurch Press, published on Wednesday 27 June 2012.
Page 5 of Section A of the Christchurch Press, published on Wednesday 28 November 2012.
Page 3 of Section A of the Christchurch Press, published on Monday 22 October 2012.
Page 5 of Section A of the Christchurch Press, published on Tuesday 18 September 2012.
Page 2 of Section A of the Christchurch Press, published on Friday 29 June 2012.
Photograph captioned by BeckerFraserPhotos, "The new Westende Jewellers building on the corner of Manchester and Worcester Streets. The former building collapsed in the 4 September 2010 earthquake".
Page 1 of Section A of the Christchurch Press, published on Wednesday 12 December 2012.
A proposed design by John Raven for a new cathedral, tied to a cordon fence. Clarendon Tower can be seen in the background. The photographer comments, "Someone is asking for designs for a new Christchurch Cathedral after it was announced that the old historical building will not be repaired, to be put on the fences through which people can see the de-construction of the old one. This design looks a great one to me".