Search

found 117 results

Videos, UC QuakeStudies

A video about the Christchurch central city in the days after the 4 September 2010 earthquake. The video includes footage of empty streets, and New Zealand Police and Army members guarding the cordons. It also includes footage of engineers checking the safety of buildings.

Videos, UC QuakeStudies

A video showing engineers removing the latticework from the top of the Press Building in Cathedral Square. The latticework is being removed after engineers discovered it was being held onto the building by only two bolts. The bolts are no bigger than a little finger.

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Brian McIndoe, ECAN Waimakariri Area Engineer, inspects one of the cracks which is causing concern on the stop bank".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Brian McIndoe, ECAN Waimakariri Area Engineer, inspects one of the cracks which is causing concern on the stop bank".

Videos, UC QuakeStudies

A video about engineers recovering the internal copper dome of the Cathedral of the Blessed Sacrament by lifting it out in one piece. The dome was undamaged after the 22 February 2011 earthquakes, but lost most of its supporting columns. Engineers have decided to remove the dome to ensure it will not be damaged during further aftershocks.