Photograph captioned by BeckerFraserPhotos, "Looking along Gloucester Street from the Oxford Terrace intersection. The central library is to the left".
The ground floor of the Central Library on Gloucester Street. Books have fallen off the shelves and are in piles in the aisles.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A photograph of the interior of the new temporary central library. The photograph is captioned by BeckerFraserPhotos, "Central Library Peterborough".
Photograph captioned by BeckerFraserPhotos, "Christchurch City Library in the CD shelving area".
A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A photograph captioned by BeckerFraserPhotos, "Central Library Peterborough was opened to provide a place for library services in the central city. It is stocked with the books that were on circulation when the earthquake happened, as the majority of the Central Library book stock is still inaccessible in the Gloucester Street building".
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
Photograph captioned by BeckerFraserPhotos, "Autumn leaves form a thick pile in front of the boarded-up door".
An aerial photograph captioned by BeckerFraserPhotos, "Central city blocks bounded by Colombo Street, Hereford Street, Cashel Street, and High Street".
An aerial photograph of the Christchurch central city. The photograph has been captioned by BeckerFraserPhotos, "Tall buildings of the central city with the Christ Church Cathedral in the middle".
A photograph captioned by Paul Corliss, "Central Police Station".
A photograph captioned by Paul Corliss, "Central Police Station".
A photograph captioned by Paul Corliss, "Central Police Station".
Army personnel secure the cordon in the central city.
A photograph captioned by Paul Corliss, "Central Police Station".
A photograph captioned by Paul Corliss, "Central Police Station, Hereford Street".
A photograph captioned by Paul Corliss, "Central Police Station, Hereford Street".
A photograph captioned by Paul Corliss, "Central Police Station".
A diagram created in 2011, showing the communication structure across rebuild agencies.
An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.
A plan which describes how SCIRT would manage the risks associated with rebuilding horizontal infrastructure within Christchurch's central city area. The first version of this plan was produced on 24 October 2013.
Army personnel secure the cordon in the central city.
Army personnel secure the cordon in the central city.