Project prioritisation - right thing, right time, right place
Articles, UC QuakeStudies
A document which outlines how SCIRT prioritised the 634 construction projects within its programme of work.
A document which outlines how SCIRT prioritised the 634 construction projects within its programme of work.
A document which describes SCIRT's framework, principles and process of defining projects and the process of prioritising those projects.
A document which outlines the processes involved in the Multi Criteria Analysis Asset Prioritisation tool. It also talks about assumptions made and potential gaps.
A map showing the actual construction start dates.
A presentation to the IPWEA conference of a paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.
A paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.
An example of the five year rebuild schedule map created as part of the prioritisation process detailing where and when construction would start. The data behind this map was updated every quarter.
A presentation given at the New Zealand Geospatial Research Conference 2015.
A plan which outlines how SCIRT is to carry out condition investigations and analysis. The first version of this plan was produced on 1 September 2011.
A paper which outlines the observed damage to Christchurch City Council-owned retaining walls and the repair solutions developed.
A pdf copy of a PowerPoint presentation made for the Water Services Association of Australia conference, about SCIRT's approach to asset investigation after the Canterbury earthquakes of 2010 and 2011.
A document which contains the slide notes to go with the PowerPoint presentation made for the Water Services Association of Australia conference.
A technical paper prepared for the Water NZ conference and expo 2012, which details how GIS and InfoNet were used to complement SCIRT's asset assessment process.
A document which outlines SCIRT's post-earthquake asset assessment process.
A diagram which illustrates SCIRT's asset assessment request process.
A pdf copy of a PowerPoint presentation prepared for the Christchurch City Council and CPG New Zealand, providing an overview of the investigation work completed.
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
A design guideline which provides information about how to use the SCIRT Asset Assessment Spreadsheet.
A magazine article which outlines the observations of engineers working on SCIRT retaining wall and ground improvement projects.
An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.
A paper published in the Journal of Structural Integrity and Maintenance, 2016, Vol. 1, No. 2, 88-93, which outlines the importance of asset registers and level of service in the wake of a disaster.
An example of a paper which explains the role of an Asset Owner's Representative - Stormwater at SCIRT.
An example of a paper which explains the role of an Asset Owner's Representative - Transport Structures at SCIRT.
A designer's guideline which explains the role of Technical Leads at SCIRT.
An example of a paper which explains the role of an Asset Owner's Representative - Water Supply at SCIRT.
An example of a paper which explains the role of an Asset Owner's Representative - Three Waters at SCIRT.
A graphic listing Christchurch City Councillors' views on asset sales.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "KeepOur Assets (KOA)".
A graphic for an article about the proposed sale of Christchurch City Council assets.
This document describes the tool developed for capturing the abandoned and removed assets using the SCIRT GIS viewer.