A diagram created in 2011, showing the communication structure across rebuild agencies.
An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A video of a presentation by Ross Butler, Chair of Otakaro Limited, at the 2016 Seismics in the City Conference. The presentation is titled, "Anchors Aweigh".The abstract for the presentation reads, "A review and preview of the development of the city's anchor projects once the Canterbury Earthquake Recovery Authority is disbanded in April."
A graphic showing the council's liabilities on infrastructure and the anchor projects.
A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.
A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.
A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.
A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.
A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.
A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.
A photograph of the launch event for Gap Filler's Grandstadium at the Retro Sports Facility (The Commons). The Grandstadium is a re-locatable mini-grandstand. The launch event took place as part of FESTA 2014.