Search

found 522 results

Articles, UC QuakeStudies

An example of the five year rebuild schedule map created as part of the prioritisation process detailing where and when construction would start. The data behind this map was updated every quarter.

Images, UC QuakeStudies

A proposed design by John Raven for a new cathedral, tied to a cordon fence. Clarendon Tower can be seen in the background. The photographer comments, "Someone is asking for designs for a new Christchurch Cathedral after it was announced that the old historical building will not be repaired, to be put on the fences through which people can see the de-construction of the old one. This design looks a great one to me".