A photograph of a room in the Diabetes Centre which has been made ready for painting. The carpet has been covered in plastic and the furniture removed from the room. Painters scaffolding has also been set up inside the room.
A photograph of a room in the Diabetes Centre which has been prepared for repainting. Plastic sheeting has been placed over the carpet and the cracks in the pillar have been filled with epoxy resin.
A section of the brick wall on the Croydon House B&B Hotel has crumbled, exposing an interior room. Spray paint markings left by USAR can be seen on the house and fencing.
A section of the brick wall on the Croydon House B&B Hotel has crumbled, exposing an interior room. Spray paint markings left by USAR can be seen on the house and fencing.