Interview with Shamus Wallace
Articles, UC QuakeStudies
Interview with Engineering Geologist, Shamus Wallace. This interview was conducted by Emma Kelland as part of Deidre Hart's Coastal and River Earthquake Research project.
Interview with Engineering Geologist, Shamus Wallace. This interview was conducted by Emma Kelland as part of Deidre Hart's Coastal and River Earthquake Research project.
Interview with Canterbury Earthquakes Geospatial Reserach Fellow, Matthew Hughes. This interview was conducted by Emma Kelland as part of Deirdre Hart's Coastal and River Earthquake Research project.
Interview with Coastal Procces Geomophologist, R.M. Kirk. This interview was conducted by Emma Kelland as part of Deirdre Hart's Coastal and River Earthquake Research project.
An interview with Coastal Resources Scientist, Justin Cope, and Natual Hazard Analyst, Marion Irwin. This interview was conducted by Emma Kelland as part of Deirdre Hart's Coastal and River Earthquake Research project .
Interview with Surface Water Planner, Graham Harrington. This interview was conducted by Emma Kelland as part of Deirdre Hart's Coastal and River Earthquake Research project.
Interview with Coastal and River Geomorphologist, Murray Hicks. This interview was conducted by Emma Kelland as part of Deirdre Hart's Coastal and River Earthquake Research project.
A presentation by Dr Matthew Hughes (Department of Civil and Natural Resource Engineering) on "Liquefaction Impacts on Christchurch's Water and Wastewater Networks".
"Training and Education of Engineers and Organisation of Engineering Profession and Building Assessment after Earthquakes", a report submitted by the then New Zealand Historic Places Trust on the Royal Commission Discussion Papers.
Slides from part one of the presentation by Dr Sonia Giovinazzi (Department of Civil and Natural Resouce Engineering) on "Recovery of Lifelines".
Slides from part two of the presentation by Dr Sonia Giovinazzi (Department of Civil and Natural Resouce Engineering) on "Recovery of Lifelines".
A presentation by Dr Charlotte Brown (Department of Civil and Natural Resource Engineering) on "A Waste-Full Recovery: Managing waste after the 2010/2011 Christchurch earthquakes".
A video of an interview with Mark Yetton, Engineering Geologist at the Port Hills Geotech Group, about their work to assess the risk of rock fall and cliff collapse on the Christchurch Port Hills.
A video of a press conference about the ChristChurch Cathedral. The video includes statements by Jim Anderton and Stefano Pampanin, Associate Professor of Engineering at the University of Canterbury. Anderton and Pampanin discuss a report produced by the Great Christchurch Buildings Trust (GCBT) which outlines how the cathedral could be safely restored. The Anglican Church has agreed to review the report.
A video of Press journalist Martin Van Beynen talking about the Canterbury Television Building which collapsed during the 22 February 2011 earthquake. Beynen investigates the construction manager of the building, Gerald Shirtcliff, who allegedly faked an engineering degree and stole the identity of an engineer he knew in South Africa. The video also includes footage of Shirtcliff giving evidence about the CTV Building at the Canterbury Earthquake Royal Commission.