A photograph of the Greendale Fault line, now visible across a paddock due to cracks caused by the 4 September 2010 earthquake.
A video of soldiers from Delta Company from 2/1 Battalion Royal NZ Infantry Regiment using the Environment Canterbury (ECan) building on Kilmore Street for a training exercise.
A page banner promoting an article titled, "No ECan election".
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Ian Heslop, ECAN Design and Operations Engineer".
This report was the first report in the district series, and has a different format to later reports. It includes all natural hazards, not only earthquake hazards. It describes earthquake, flooding, meteorological, landslide and coastal hazards within Hurunui district and gives details of historic events. It includes district-scale (1:250,000) active fault and flood hazard maps. The report describes an earthquake scenario for a magnitude 6.9 earthquake near Cheviot, as well as flooding, meteorological, landslide, coastal erosion, storm surge, and tsunami scenarios.
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Brian McIndoe, ECAN Waimakariri Area Engineer, inspects one of the cracks which is causing concern on the stop bank".
Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Brian McIndoe, ECAN Waimakariri Area Engineer, inspects one of the cracks which is causing concern on the stop bank".
Photo of damage to Records Hall on Pegasus Ground Floor, taken by Publications.
Photo of damage to Records Hall on Pegasus Ground Floor, taken by Publications.
Photo of damage to Records Hall on Pegasus Ground Floor, taken by Publications.
Photo of damage to Records Hall on Pegasus Ground Floor, taken by Publications.
Photo of damage to Records Hall on Pegasus Ground Floor, taken by Publications.
Photo of damage to Records Hall on Pegasus Ground Floor, taken by Publications.
Photo of damage to Records Hall on Pegasus Ground Floor, taken by Publications.
Photo of damage to Records Hall on Pegasus Ground Floor, taken by Publications.
Photo of damage to Records Hall on Pegasus Ground Floor, taken by Publications.
A video of an interview with Wayne Holton-Jeffreys, Public Transport Manager at Enivonment Canterbury, about the bus shortage in Christchurch after the 4 September 2010 earthquake.
Photograph captioned by BeckerFraserPhotos, "The Environment Canterbury Emergency Management Office".
Photograph captioned by BeckerFraserPhotos, "The Environment Canterbury Emergency Management Office".
Photograph captioned by BeckerFraserPhotos, "The Environment Canterbury Emergency Management Office".
Collection Overview of 'Liquefaction Studies.'
Photo of damage in Canterbury, taken by John Weeber.
Photo of damage in Canterbury, taken by John Weeber.
Photo of damage in Canterbury, taken by John Weeber.
Photo of damage to offices on Pegasus 3rd Floor, taken by Compliance Enforcement.
Photo inside of Level 2 of Pegasus Building taken by Angela Dean, 9 June 2011
Photo inside of Level 3 of Aoraki Building taken by James Thompson, 5 September 2010.
Photo of damage to Waimakariri River South Branch(primary bank), taken by John Dore, 8 September 2010.
Photo of damage in Kaiapoi, taken by Compliance Enforcement, 10 September 2010.
Photo of damage in Halswell & Tai Tapu, taken by Dan Harrison, 6 September 2010.