Ongoing repair and deconstruction work on Victoria Street. A demolition site has been turned to a carpark.
Ongoing repair and deconstruction work on Victoria Street. The car park to the left of the image was left after the demolition of a building.
Deconstruction of office buildings next to the COCA gallery. In front of the buildings are piles of demolition rubble.
Detail of some deconstruction work on the Crowne Plaza Hotel, close up with a digger on a pile of demolition rubble.
The head of a digger resting on a pile of soil next to QEII Stadium. The photographer comments, "The deconstruction of the QEII stadium in Christchurch pauses on a Sunday".
A chart giving costs for repair or rebuild of Christchurch City Council facilities.
Corrogated roofing from the demolition of the QEII complex. The photographer comments, "This collection of galvanised roofing looks so photogenic as I walked around the partly demolished Queen Elizabeth stadium and swimming pool".
Various rebuilding and repairing activities on Gloucester Street, with road signs and cranes in the background.
A digitally manipulated image of the high diving boards at QEII swimming pool. Rubble has fallen on the boards during the demolition of the complex. The photographer comments, "The diving board at the QEII stadium swimming pool during its demolition after being damaged in the Christchurch earthquake in February 2011".
An infographic showing estimated repair costs for major Christchurch City Council facilities.
A cordon check point on Durham Street. The demolition site was a building that housed Laycock Collision Repairs.
A digitally manipulated image of the high diving boards at QEII swimming pool. Rubble has fallen on the boards during the demolition of the complex. A sign reads "Poseidon Extreme". The photographer comments, "I do not know what Poseidon Extreme at this swimming pool looked like before the earthquake damaged it, but it looks really radical now during it's demolition. A strange coincidence is that Poseidon is referred to as 'Earth-Shaker' due to his role in causing earthquakes. So the demolition of this pool due to the series of quakes in Christchurch all seems to be foretold by the gods and that sign".
A page banner promoting articles about a repair report for Christ Church Cathedral, and the controlled demolition of Radio Network House.
A digitally manipulated image of an excavator demolishing a house. The photographer comments, "My neighbour I thought was going to be one of the first to be rebuilt in the area after being damaged in the 22 February 2011 earthquake, but the builders have knocked it down and not returned yet".
A proposed design by John Raven for a new cathedral, tied to a cordon fence. Clarendon Tower can be seen in the background. The photographer comments, "Someone is asking for designs for a new Christchurch Cathedral after it was announced that the old historical building will not be repaired, to be put on the fences through which people can see the de-construction of the old one. This design looks a great one to me".
The deconstruction of the Crowne Plaza Hotel, with a digger and a pile of demolition rubble in front. Road cones and signs have been placed in front to divert traffic around the area. Flags in Canterbury colours, red and black can be seen on the street lights.
The deconstruction of the Crowne Plaza Hotel, with a digger and a pile of demolition rubble in front. Road cones and signs have been placed in front to divert traffic around the area. A flag in Canterbury colours, red and black can be seen on the street lights.
A digitally manipulated photograph of twisted reinforcing rods amongst the rubble from the demolition of QEII. The photographer comments, "These rarely seen worms live in the pressurised earth under the foundations of buildings. They need a damp soil and be under at least 100 pounds of pressure per square inch. After the destructive force of an earthquake they swiftly rise to the surface through gaps in the rubble. Unfortunately they quickly die and then crystallise as hard as iron in the dry low pressure air".
A cordon check point on Durham Street. The demolition site was a building that housed Laycock Collision Repairs. The Christchurch Casino can be seen in the background.
Deconstruction of the Pacific Brands House on Victoria Street.
Detail of the deconstruction work being done on the Crowne Plaza Hotel.
Detail of the deconstruction work on the Pacific Brands House on Victoria Street.
A public talk by Helina Stil, South Island Manager at Nikau Contractors. This talk, entitled 'Deconstruction to construction', formed part of the Plenary Two session, 'Clearing the decks'.
Deconstruction of the Crowne Plaza Hotel. A crane and digger are seen at work.
A video of excavators demolishing the former railway station on Moorhouse Avenue. The building was only moderately damaged during the 22 February 2011 earthquake, but repair work was deemed too costly for the co-owner, Science Alive!.
A digitally manipulated image of damaged buildings on St Asaph Street.
A video about the discovery of a historic tramline on North Avon Road. The video includes an interview with Brent Leersynder, a site engineer for SCIRT, and Steve Timpson, site foreman for SCIRT. The SCIRT team found the tramline while repairing the damaged wastewater system under North Avon Road in May.
Detail of the deconstruction of the Crowne Plaza Hotel. The windows in the building has been removed.
Workers working on the deconstruction of Clarendon Towers from the corner of Worcester Boulevard and Oxford Terrace.
Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cotterill family are picking up the pieces and rebuilding. Builders repair the master bedroom where a large brick chimney came through the room narrowly missing the Cotterills and totally obliterating their bed".