A map showing the actual construction start dates.
A document which outlines how SCIRT prioritised the 634 construction projects within its programme of work.
A graphic illustrating proposed construction projects.
A graphic giving information about proposed construction projects.
Volunteers tying down cables during the construction of the Pallet Pavilion.
A plan which details how SCIRT managed its construction work and ensured a consistent best-practice approach across the approximately 700 projects in the rebuild programme.
Volunteers drilling holes in pallets during the construction of the Pallet Pavilion.
Volunteers standing on top of pallets during the construction of the Pallet Pavilion.
Two volunteers taking a break during the construction of Gap Filler's Pallet Pavilion.
Volunteers laying stones on the ground during the construction of the Pallet Pavilion.
An example of the five year rebuild schedule map created as part of the prioritisation process detailing where and when construction would start. The data behind this map was updated every quarter.
A crane lifting stacks of painted pallets during the construction of the Pallet Pavilion.
Volunteers and Gap Filler staff taking a break during the construction of the Pallet Pavilion.
A volunteer posing in his kilt on St Andrew's Day, during the construction of the Pallet Pavilion.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men put the walls together.
A volunteer on top of one of the Pallet Pavilion walls during construction. Scaffolding has been constructed around the wall out of wood.
A volunteer on top of one of the Pallet Pavilion walls during construction. Scaffolding has been constructed around the wall out of wood.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. A volunteer putting the roof together.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Three volunteers putting the roof together.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men nail the walls together.
The site of the demolished Crowne Plaza Hotel on the corner of Durham and Kilmore Streets. The construction of the Pallet Pavilion is underway.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men add insulation to the back wall.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. A volunteer measures a spot on the roof for the solar panels.
A zip file of photographs from a time-lapse series documenting the construction of Gap Filler's Pallet Pavilion. The photographs were taken from the top of the Christchurch Casino.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. A volunteer drills a hole in the roof for the solar panels.
A time-lapse video documenting the construction of Gap Filler's Pallet Pavilion. The video is made up of photographs taken from the top of the Christchurch Casino.
Furniture made of recycled wood situated in an empty construction site. The furniture was part of the Gap Filler project.