A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.
A diagram created in 2011, showing the communication structure across rebuild agencies.
An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
The Canterbury earthquakes destroyed the Christchurch CBD and caused massive disruption to business across the region. There was an urgent need to support business survival and foster economic recovery. Recover Canterbury is a hub providing seamless support for businesses affected by the earthquakes, giving them easy access to government and commercial expertise in a one-stop shop.
A document which outlines several of Downer's safety initiatives, developed when working in the Central Business District.
A photograph taken in 2013, showing one of the 32 large 'Open for Business' signs placed on all of the main routes into the CBD.
A spray-painted message on a wall of Englefield Lodge reads "We will try to save this house." Wooden bracing supports the wall. The photographer comments, "A bike ride around the CBD. Englefield, Christchurch's oldest house in Fitzgerald Ave".
Damage to Englefield Lodge on Fitzgerald Avenue. A pile of bricks lies in front of the house, windows are boarded up, and wooden bracing is propping up the walls. A spray-painted message on a wall reads "We will try to save this house." The photographer comments, "A bike ride around the CBD. Englefield, Christchurch's oldest house, in Fitzgerald Ave".