A plan which describes how SCIRT would manage the risks associated with rebuilding horizontal infrastructure within Christchurch's central city area. The first version of this plan was produced on 24 October 2013.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
Photograph captioned by BeckerFraserPhotos, "Planning staff in conversation about the draft city plan".
Photograph captioned by BeckerFraserPhotos, "The CCC held a road show to gather the citizens' opinions on how Christchurch should be redeveloped".
Photograph captioned by BeckerFraserPhotos, "The CCC held a road show to gather the citizens' opinions on how Christchurch should be re-developed".
Photograph captioned by BeckerFraserPhotos, "The CCC held a road show to gather the citizens' opinions on how Christchurch should be redeveloped".
Photograph captioned by BeckerFraserPhotos, "The CCC held a road show to gather the citizens' opinions on how Christchurch should be redeveloped".
A tool, including an outline, resources and a survey sheet, used by SCIRT's Transport Planning Manager when delivering a series of toolboxes to SCIRT traffic staff about working around businesses.
Photograph captioned by BeckerFraserPhotos, "New reconstruction where it is planned to add a new ground floor to this basement in Lichfield Street and then build the building".
Photograph captioned by BeckerFraserPhotos, "The plan for this building in Lichfield Street (as relayed to Ross by the contractors) is to remove the roof and open as a bar within 3 weeks".
Photograph captioned by BeckerFraserPhotos, "The plan for this building in Lichfield Street (as relayed to Ross by the contractors) is to remove the roof and open as a bar within 3 weeks".