Members of the public walking up Colombo Street in the aftermath of the 22 February earthquake. Behind them emergency personnel are using a crane to check the floors of the Forsyth Barr building for trapped people.
The former Public Library building on the corner of Hereford Street and Cambridge Terrace. The brickwork of the gables has crumbled onto the street. Wire fencing has been placed around the building to keep people away.
A photograph two members of the public looking at liquefaction on Dundas Street shortly after the 22 February 2011 earthquake. In the distance a police car is parked underneath the earthquake damaged Smiths City car park.
The former Public Library on the corner of Hereford Street and Cambridge Terrace. The brickwork on the gable has crumbled into the street below and wire fencing has been placed around the building to keep people away.
Members of the public at Gap Filler's "Film in the Gap!" project in Beckenham. Gap Filler has provided old beds and garden swing seats as seating. In the background, the red Southern Espresso Rescue van can be seen.
Gap Filler and Poetica's "Instant Poetry" wall on Colombo Street. One of Shakespeare's sonnets has been painted on the mural as well as a blackboard. Members of the public are encouraged to add their poems to the blackboard.
A photograph of a member of the public and a camera man standing in front of collapsed stores on Manchester Street taken shortly after the 22 February 2011 earthquake. An excavator can be seen in the background removing rubble.
A photograph of New Zealand Army personnel and members of the public arriving at a Civil Defence Report Centre. The report centre was set up in the garage of a school in Christchurch after the 22 February 2011 earthquake.
The sun shines on a New Zealand flag. The flag is held by a member of the public at the Christchurch Earthquake Memorial Service. More than 40,000 people attended the memorial service in Hagley Park on 18 March 2011.
The sun shining on a New Zealand flag. The flag is being held by a member of the public at the Christchurch Earthquake Memorial Service. More than 40,000 people attended the memorial service in Hagley Park on 18 March 2011.
Members of the public watching Lyttelton band, Runaround Sue, perform at Gap Filler's "Film in the Gap!" project in Beckenham. In the foreground is one end of a fence made of old metal bed heads and decorated with fairy lights.
A photograph of the Cathedral Square walkway running from Gloucester Street to Cathedral Square. The walkway was opened up for a few days to allow the public a closer look at the cathedral. An excavator can be seen in the background.
A CERA information sign on the fence in the Cathedral, placed to provide information to the public about the buildings seen from Cathedral Square. This one says "Regent Theatre: This has been demolished (see bottom left, now vacant site in photograph".
Furniture spray-painted with drawings and words by members of the public as part of the Words of Hope project. A message can be seen, reading, "Rebuild Christchurch, be proactive, don't be reactive. Don't miss this opportunity, kia kaha".
A photograph of the Domo furniture store, Whites Building and the Edison Building on Tuam Street shortly after the 22 February 2011 earthquake. Members of the public can be seen walking down the road as they attempt to leave the central city.
A photograph of a safety notice at the entrance to the walkway opened between Cashel Mall and Cathedral Square in order for the public to view Cathedral Square. The photograph is captioned by BeckerFraserPhotos, "The Cashel Mall to Cathedral Square walkway".
A collapsed section of the Cranmer Courts on the corner of Montreal Street and Kilmore Street. Safety fences have been erected around the building to prevent the public getting close enough to it to be endangered by falling masonry in the event of another earthquake.
A video of a media a preview of the CERA Red Zone bus tour. The Red Zone bus tours have been created by CERA to allow the public to view the Christchurch central city which has been closed for eight months since the 22 February 2011 earthquake.
A CERA information sign on the fence in the Cathedral Square, placed to provide information to the public about the buildings seen from Cathedral Square. This one says "Clarendon Tower: This will be demolished. Currently CERA is working towards the appointment of an accredited demolistion contractor".
A photograph of a notice on the fence of a house on Marine Parade in North Brighton. The notice reads, "Public Notice, EQC and other parties have declared this property stable and of no threat to the safety of any other parties. Dated 15/03/11. Please keep out".
A photograph of a notice on the window of a house on Marine Parade in North Brighton. The notice reads, "Public Notice, EQC and other parties have declared this property stable and of no threat to the safety of any other parties. Dated 15/03/11. Please keep out".
A photograph of concerned members of the public looking up at the Hotel Grand Chancellor, shortly after the 22 February 2011 earthquake. Many of the people in the crowd are structural engineers from all over the world who travelled to Christhcurch for an earthquake workshop. The workshop was just about to begin when the 22 February 2011 earthquake hit.
A photograph of concerned members of the public looking up at the Hotel Grand Chancellor, shortly after the 22 February 2011 earthquake. Many of the people in the crowd are structural engineers from all over the world who travelled to Christhcurch for an earthquake workshop. The workshop was just about to begin when the 22 February 2011 earthquake hit.
A notice nailed to a tree near the river reads, "Health warning, contaminated water. Due to sewage overflows this water is unsafe for human contact and activity and is a public health risk. Please keep all people and pets out of contact with the water and do not consume any seafood or shellfish collected from this area".
A portaloo ouside an apartment building, on the wall next to it is a red sticker, informing the public the site is dangerous and not to enter. On the other side are spray painted codes left by USAR after it had been cleared. This system was used following the February earthquake to mark buildings that have been checked.
Members of the public speaking with police officers on the corner of Durham Street and Armagh Street in the aftermath of the 22 February earthquake. On the right the timber section of the historic Provincial Council Chambers can be seen, including the clock tower which has collapsed onto the road. Armagh Street leading into the city has been cordoned off by red tape.
A plaque for an artwork on the corner of High Street and Tuam Street reads "'Corgis on High'. A Christchurch City Council Public Artwork. Artist David Marshall. Proudly Sponsored by Central City Revitalisation Project, Christchurch City Council, Lion Foundation, McKenzie and Willis Ltd. Supported by South Island Welsh Corgi League. 6 December 2003." The photographer comments, "The corgis have been removed. Temporarily??".
Furniture spray-painted with drawings and words by members of the public as part of the Words of Hope project. Messages can be seen, such as, "Oneness, lovingness, synchronised hearts", "Take it easy! Yay...words of hope!", "Think differently", "Happy, happy, happy", "Christchurch FTW", "Life is for loving", "Life is beautiful", "Plant and grow", "Rise up", and "Keep going Chch".
A sculpture titled 'Passing Time' on the corner of St Asaph Street and Madras Street. 'Passing Time' was installed outside the CPIT Building for the 6th SCAPE (a contemporary public art programme in Christchurch) a few days prior to the 22 February 2011 earthquake. The work features twisting boxes depicting each year between 1906 (the founding of CPIT) and 2010 (the date of the sculpture's production).
A sculpture titled 'Passing Time' on the corner of St Asaph Street and Madras Street. 'Passing Time' was installed outside the CPIT Building for the 6th SCAPE (a contemporary public art programme in Christchurch) a few days prior to the 22 February 2011 earthquake. The work features twisting boxes depicting each year between 1906 (the founding of CPIT) and 2010 (the date of the sculpture's production).