The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men put the walls together.
A volunteer on top of one of the Pallet Pavilion walls during construction. Scaffolding has been constructed around the wall out of wood.
A volunteer on top of one of the Pallet Pavilion walls during construction. Scaffolding has been constructed around the wall out of wood.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. A volunteer putting the roof together.
A paper presented at the New Zealand Concrete Industry Conference 2015 about the design and construction challenges faced when strengthening the Memorial Arch.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Three volunteers putting the roof together.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men nail the walls together.
A construction site on Wakefield Avenue in Sumner that has been red-stickered due to rock fall danger from the cliff behind it.
A building under construction on Colombo Street in Sydenham. In the distance, two murals can be seen on the sides of a building.
A construction site on Wakefield Avenue in Sumner that has been red-stickered due to rock fall danger from the cliff behind it.
A video of an interview with Earthquake Recovery Minister Gerry Brownlee and Frank Delli Cicchi, the Grand Central Group Australian and New Zealand general manager, about the demolition of the Hotel Grand Chancellor. The Grand Chancellor is the tallest building in Christchurch, and was severely damaged during the 22 February 2011 earthquake. Fletcher Construction have been chosen to demolish the building.
A historic sketch of the Manchester Courts, seen from the corner of Manchester and Hereford Streets, [1905].
A photograph captioned by BeckerFraserPhotos, "Road works along Woodham Road in Linwood".
A PDF copy of The Star newspaper, published on Friday 14 December 2012.
A photograph of wooden planks used in the construction of Gap Filler's temporary outdoor cinema. The boards have a crown logo painted on them.
A video of a CTV News broadcast of a Ministry of Women's Affairs initiative to attract more women into trades and construction related jobs.
The site of the demolished Crowne Plaza Hotel on the corner of Durham and Kilmore Streets. The construction of the Pallet Pavilion is underway.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Building construction in Edgeware. This will eventually house a SuperValue supermarket, on the fence is a large sign that says 'Kia Kaha Chch'.
Wood and bricks on Canterbury Street in Lyttelton. This construction material has been stripped from the house behind. To the right is a digger.
Photograph captioned by BeckerFraserPhotos, "University grounds, College House, and Bishop Julius hall of residence, with the new supermarket under construction at centre right".
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men add insulation to the back wall.
The public walking through and taking photographs of the ongoing deconstruction and construction work in the CBD. Two diggers can be seen in the background.
The top story of Fuze Restaurant and Cafe is dismantled by construction workers. The building formerly housed the Harbour Board offices, and was built in 1880.
A photograph captioned by BeckerFraserPhotos, "Roadworks on the intersection of Gloucester Street and Woodham Road".
A photograph captioned by BeckerFraserPhotos, "Roadworks on the intersection of Gloucester Street and Woodham Road".
Photograph captioned by BeckerFraserPhotos, "The construction of this window frame at Cranmer Court is clearly seen when the exterior stone has collapsed in the earthquake".
A time-lapse video documenting the construction of Gap Filler's Pallet Pavilion. The video is made up of photographs taken from the top of the Christchurch Casino.