Search

found 2617 results

Articles, UC QuakeStudies

A plan which aims to ensure the SCIRT programme complies with set specifications, design and industry quality standards. The first version of this plan was produced on 20 July 2011.

Articles, UC QuakeStudies

A document that outlines how timely and accurate information relating to estimating, actual project costs, future commitments, and total forecast cost, will be managed and reported for each project phase in the programme.

Images, UC QuakeStudies

A photograph of the Hororata Hotel, which was damaged in the 4 September earthquake. A sign outside the hotel reads, "This is not the Hororata Pub. Private residence. No parking. No thoroughfare".

Articles, UC QuakeStudies

A PDF copy of an image created for the Summer Starter. The image features an All Right? 'tip of the week', which reads, "Who could you enlist for a walky, talky catchup? Good friends are awesome- even when times are tough." The image was published in The Press in the lead-up to the 2015 Summer Starter.

Images, UC QuakeStudies

A photograph of Chisnallwood Intermediate pupils on the inaugural walk for the Chisnallwood Trail. The 'All Righties' are walking with the school pupils along a neighbourhood street. The photograph was taken at the launch of the Chisnallwood AWA trail at Chisnallwood Intermediate. All Right? posted the photograph on their Facebook page on 2 September 2015 at 3:55pm.