Search

found 448 results

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team and the New Zealand Police inspecting the Cherish Bridal and Formal Wear store on Montreal Street. Inside the store one of the ERT members is attempting to break through a wall.

Images, UC QuakeStudies

Members of the USAID Disaster Assistance Response Team (DART) and New Zealand Urban Search and Rescue breaking through the floor of a building which was severely damaged during the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team standing on the corner of Lichfield and Manchester Streets. In the background an excavator has been parked on the street. In the background is a large pile of rubble from several earthquake-damaged buildings.

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team and the New Zealand Police inspecting the Cherish Bridal and Formal Wear store on Montreal Street. Inside the store one of the ERT members is attempting to break through a wall.

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team and the New Zealand Police inspecting the Cherish Bridal and Formal Wear store on Montreal Street. Inside the store one of the ERT members is attempting to break through a wall.

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team and the Red Cross working on High and Manchester Streets. On both sides of the street there are piles of rubble from the earthquake-damaged buildings. Several excavators have been parked in a line along the street.

Images, UC QuakeStudies

A photograph of the Wellington Emergency Management Office Emergency Response Team standing in a car park on Lichfield Street. The team are wearing face and gas masks, hard hats, safety glasses, knee pads, and rubber gloves. In the background are several earthquake-damaged buildings.

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team standing on the intersection of Manchester and Lichfield Streets. In the background is the Majestic Theatre. Piles of rubble from earthquake-damaged buildings has been piled on the road below the building.

Images, UC QuakeStudies

A photograph of an excavator clearing the rubble from earthquake-damaged buildings on Lichfield Street. The rubble has been gathered from the street and piled up beside the Majestic Theatre. In the foreground a member of the Wellington Emergency Management Office Emergency Response Team is crossing the street.

Images, UC QuakeStudies

A photograph of a member of the Wellington Emergency Management Office Emergency Response Team standing on the bank of the Avon River. In the background are the remains of the collapsed PGC Building. An excavator is on top of these remains, working to clear them away.

Images, UC QuakeStudies

A photograph of a member of the Wellington Emergency Management Office Emergency Response Team standing on the bank of the Avon River. In the background are the remains of the collapsed PGC Building. An excavator is on top of these remains, working to clear them away.

Images, UC QuakeStudies

A photograph of a member of the Wellington Emergency Management Office Emergency Response Team pointing to an earthquake-damaged house in central Christchurch. A large section of the house has collapsed, the rubble spilling onto the driveway. Emergency tape has been draped across the driveway as a cordon.

Images, UC QuakeStudies

A photograph of a member of the Wellington Emergency Management Office Emergency Response Team walking through the intersection of Manchester and Gloucester Streets. In the background, Manchester Street has been cordoned off with wire fences and is littered with rubble. Many of the buildings in view are severely damaged.

Images, UC QuakeStudies

A photograph of a member of the Wellington Emergency Management Office Emergency Response Team inside an office. In the foreground, the drawers of filing cabinets have opened. Files and posters litter the ground. The coverings over the lights have shaken loose, and one is hanging just behind the ERT member.

Images, UC QuakeStudies

A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. After nearly five years of 'Emergency Response' where sustainability has been sacrificed in the interests of speed, we can assume that this phase is now behind us. We see no reason why this period should be extended until April 2016. Lessons must be learned from the past. It is time to move into the 'Restoration Phase'. Once seismic and building standards are corrected, and risks are notified, mapped and accepted, sustainability will be ensures. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents. We support option 3+."