The site of the demolished Crowne Plaza Hotel on the corner of Durham and Kilmore Streets. The construction of the Pallet Pavilion is underway.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Wood and bricks on Canterbury Street in Lyttelton. This construction material has been stripped from the house behind. To the right is a digger.
Photograph captioned by BeckerFraserPhotos, "University grounds, College House, and Bishop Julius hall of residence, with the new supermarket under construction at centre right".
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men add insulation to the back wall.
The top story of Fuze Restaurant and Cafe is dismantled by construction workers. The building formerly housed the Harbour Board offices, and was built in 1880.
A photograph captioned by BeckerFraserPhotos, "Roadworks on the intersection of Gloucester Street and Woodham Road".
A photograph captioned by BeckerFraserPhotos, "Roadworks on the intersection of Gloucester Street and Woodham Road".
Photograph captioned by BeckerFraserPhotos, "The construction of this window frame at Cranmer Court is clearly seen when the exterior stone has collapsed in the earthquake".
A time-lapse video documenting the construction of Gap Filler's Pallet Pavilion. The video is made up of photographs taken from the top of the Christchurch Casino.
A detailed presentation prepared by SCIRT IST's commercial manager to inform Delivery Team commercial managers about the processes and requirements relating to SCIRT's commercial model.
A photograph captioned by BeckerFraserPhotos, "The T Bakery on Woodham Road, one of the first rebuild projects".
A PDF copy of The Star newspaper, published on Friday 29 June 2012.
A photograph of the entrance to Ballantynes on Cashel Street. A sign by the door that states the building is a construction site and a multiple hazards area.
A PDF copy of The Star newspaper, published on Wednesday 28 November 2012.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. A volunteer measures a spot on the roof for the solar panels.
A zip file of photographs from a time-lapse series documenting the construction of Gap Filler's Pallet Pavilion. The photographs were taken from the top of the Christchurch Casino.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. A volunteer drills a hole in the roof for the solar panels.
Construction workers with high visibility clothing and hard hats assemble a crane on High Street to help demolish the Westpac Building. The BNZ building can be seen in the background.
A presentation prepared by one of the site engineers restoring the Memorial Arch and Bridge of Remembrance, outlining the damage to the structures, the repair designs and the construction methodologies.
A photograph of a large frame being constructed in a car park in Re:START mall for Canterbury Tales. Canterbury Tales was the main event of FESTA 2013.
A photograph of a large frame being constructed in a car park in Re:START mall for Canterbury Tales. Canterbury Tales was the main event of FESTA 2013.
A photograph of a large cardboard platform wrapped in blue plastic and ropes, lying near the Avon River on Cambridge Terrace. The platform is part of Canterbury Tales, which was the main event of FESTA 2013.
An example of the five year rebuild schedule map created as part of the prioritisation process detailing where and when construction would start. The data behind this map was updated every quarter.
Kilmore Street, looking west from Manchester Street. The street has been barred off by wire fencing. A pile of steel, construction equipment and a portaloo sit in front of the cordon.
A photograph of the new Press Building on Gloucester Street under construction. To the right, the former Theatre Royal can be seen with wooden beams placed under the awning for support.
Demolition along Kilmore Street. A digger can be seen as well as a construction worker with a high hat and high-visibility vest. The rubble has been separated into different piles.
Fencing in Poplar Lane cuts one side off from the other, but a City Council sign reads "Businesses open as usual during construction", indicating the stores and bars are still open.