Search

found 2160 results

Images, UC QuakeStudies

A photograph of equipment from the New Zealand Fire Service Urban Search and Rescue team on display in the Canterbury Quakes exhibition at the Canterbury Museum. The equipment was used during the emergency response to the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph of the earthquake damage to a brick wall of a building on Acton Street. Large sections of the wall have fallen away. The remaining section has large cracks between the bricks. A boat which was being stored inside has toppled over and is now sticking out of the building.

Images, UC QuakeStudies

Graffiti on a wooden wall depicts a child pointing at a site across the street and reads "I remember when the Kazbah was over there." The photographer comments, "A local street artist has commemorated Christchurch's deadliest earthquake. The anniversary is tomorrow. Where the photograph was taken was the site of the Ozone Hotel, which has now gone as well. For some of us who live and work in the East of Christchurch the earthquake was not what happened in the City as we were almost unaware of it. We had no water, toilets and most of all no electricity for weeks. For myself petrol was low and with tales of all the petrol stations on our side of town being damaged we could not take the chance of venturing out on severely damaged roads to find no petrol and the possibility of not getting home. We walked around and saw the damage that was local to us. TJ's Kazbah was one that stood out. A building that had a beauty with its round tower standing proud and always looked well kept - it was now collapsed. Its tower, which was once pointing towards the sky was laying on its side. It had kept its shape, but had a lightning shaped crack through it. The one thing that kept us feeling almost normal through the coming weeks was The Press our daily paper still being delivered even though the Press building and staff had suffered so badly themselves.

Images, UC QuakeStudies

LCPL Ryan Dempsey, from the 3rd Catering and Supply Company, photographed in the NZ Army's decontamination area. The area was set up after the 22 February 2011 earthquake in order to decontaminate equipment used in Operation Christchurch Quake. In the background is a sign reading, 'Contaminated overalls'.

Images, UC QuakeStudies

A view down Gloucester Street in the aftermath of the February 2011 earthquake, showing damage to Wave House (formerly the Trade Union building). In the sky above a helicopter can be seen carrying a monsoon bucket that was used to put out flames in the Canterbury Television building.

Images, UC QuakeStudies

Urban Search and Rescue personnel escorting construction workers down Colombo Street in the aftermath of the 22 February 2011 earthquake. Behind them a team of Fire Service and Urban Search and Rescue personnel can be seen using a crane to check the Forsyth Barr building for trapped people.

Images, UC QuakeStudies

Urban Search and Rescue personnel escorting construction workers down Colombo Street in the aftermath of the 22 February 2011 earthquake. Behind them a team of Fire Service and Urban Search and Rescue personnel can be seen using a crane to check the Forsyth Barr building for trapped people.

Images, UC QuakeStudies

Students at the University of Canterbury relaxing inside the UCSA's "Big Top" tent. The tent was erected to provide support for students in the aftermath of the 22 February 2011 earthquake. The students have spent the day clearing liquefaction from Christchurch properties as part of the Student Volunteer Army.

Images, UC QuakeStudies

A photograph of the Durham Street Methodist Church which collapsed during the 22 February 2011 earthquake. All that is left is a small section of the front wall. A large pile of masonry sits in front. To the left, scaffolding indicates the height of the building before it collapsed.

Images, UC QuakeStudies

Al Dwyer, leader of the USAID Disaster Assistance Response Team (DART), outside the US headquarters in Latimer Square. Members of DART can be seen behind him. Latimer Square was set up as a temporary headquarters for emergency management personnel after the 22 February 2011 earthquake.

Images, UC QuakeStudies

Prime Minister John Key talking to Al Dwyer, and members of the USAID Disaster Assistance Response Team (DART) outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.

Images, UC QuakeStudies

Prime Minister John Key talking to Al Dwyer, and members of the USAID Disaster Assistance Response Team (DART) outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.

Images, UC QuakeStudies

Prime Minister John Key talking to Al Dwyer, and members of the USAID Disaster Assistance Response Team (DART) outside the US headquarters in Latimer Square. John Key is visiting to thank DART for their efforts in the aftermath of the 22 February 2011 earthquake.

Images, UC QuakeStudies

A view down Colombo Street of a team of Fire Service and Search and Rescue personnel using a crane to check the Forsyth Barr building for people trapped by the 22 February 2011 earthquake. Behind them the broken tower of the Christ Church Cathedral can be seen.

Images, UC QuakeStudies

A photograph of the earthquake damage to Charlie B's Backpackers on Madras Street. The front of the building has collapsed, the bricks and other rubble spilling onto the road and footpath in front. Many of the walls inside the top storey of the building are now hanging loose from the ceiling.

Images, UC QuakeStudies

A photograph of the earthquake-damaged Cathedral of the Blessed Sacrament on Barbadoes Street. Rubble from the collapsed tower is lying on the ground in front. A car has been crushed under this rubble. Wire fencing, shipping containers, and road cones have been placed around the building as a cordon.

Images, UC QuakeStudies

A photograph of the earthquake-damaged Cathedral of the Blessed Sacrament on Barbadoes Street. Rubble from the collapsed tower is lying on the ground in front. A car has been crushed under this rubble. Wire fencing, shipping containers, and road cones have been placed around the building as a cordon.

Images, UC QuakeStudies

A photograph of the earthquake-damaged Cathedral of the Blessed Sacrament on Barbadoes Street. Rubble from the collapsed tower is lying on the ground in front. A car has been crushed under this rubble. Wire fencing, shipping containers, and road cones have been placed around the building as a cordon.

Images, UC QuakeStudies

A photograph of an alleyway between Gloucester Street and Cathedral Square. There is a pile of rubble near the end of the alleyway, fallen from the earthquake-damaged Base Backpackers building, behind the former Canterbury Times building on Gloucester Street. Scaffolding has also been constructed up the side of Base Backpackers.

Images, UC QuakeStudies

An image from an Army News March 2011 article titled, "A Helping Hand in a Disaster Zone". The image is of the Cathedral of the Blessed Sacrament on Barbadoes Street, severely damaged after the 22 February 2011 earthquake. The domes on either side of the Cathedral have collapsed and are lying in the area in front.

Images, UC QuakeStudies

A photograph of signs on the windows of the Christchurch Art Gallery. The art gallery was used as the temporary Civil Defence headquarters after the 22 February 2011 earthquake. The signs read, "Today is Thursday 3 March 2011" and "Wash your hands!". In the background, emergency management personnel and a New Zealand Fire Service truck can be seen.

Images, UC QuakeStudies

The ruins of the historic Durham Street Methodist Church in the aftermath of the 22 February 2011 earthquake. The only parts of the building still upright are those supported by steel braces placed there after the 4 September 2010 earthquake to strengthen the building as it awaited repairs. Rubble has spilled out onto the street, knocking over the safety fences that were also erected after September. Silt from liquefaction has covered the road around the church.

Images, UC QuakeStudies

The ruins of the historic Durham Street Methodist Church in the aftermath of the 22 February 2011 earthquake. The only parts of the building still upright are those supported by steel braces placed there after the 4 September 2010 earthquake to strengthen the building as it awaited repairs. Rubble has spilled out onto the street, knocking over the safety fences that were also erected after September. Silt from liquefaction has covered the road around the church.

Images, UC QuakeStudies

The ruins of the historic Durham Street Methodist Church in the aftermath of the 22 February 2011 earthquake. The only parts of the building still upright are those supported by steel braces placed there after the 4 September 2010 earthquake to strengthen the building as it awaited repairs. Rubble has spilled out onto the street, knocking over the safety fences that were also erected after September. Silt from liquefaction has covered the road around the church.

Images, UC QuakeStudies

A plaque on the ground in front of the 'Passing Time' sculpture on the corner of Madras Street and St Asaph Street. The 'Passing Time' sculpture was installed outside the CPIT Building for the 6th SCAPE (a contemporary public art programme in Christchurch) a few days prior to the 22 February 2011 earthquake. The work features twisting boxes depicting each year between 1906 (the founding of CPIT) and 2010 (the date of the sculpture's production).

Images, UC QuakeStudies

A photograph of the earthquake damage to a group of shops on Manchester Street. The closest shop has collapsed and the floor of the upper storey is hanging out of the side of the shop. To the left, the outer walls of the top storeys of the shops have collapsed, the bricks spilling onto the street.

Videos, UC QuakeStudies

A video about a fire which broke out in an earthquake-damaged building on High Street. The video includes an interview with Steve Kennedy, Canterbury Fire Service Assistant Area Manager, Brigid Fayle, who worked in the building prior to the 22 February 2011 earthquake, and Anne MacKenzie, a structural engineer who worked on strengthening the building.

Images, UC QuakeStudies

A digitally manipulated image of a fallen headstone. The photographer comments, "Since the September 2010 earthquake in Christchurch, New Zealand a lot of the headstones have fallen, but sadly a lot have not been resurrected to their former places".