The steps from Cambridge Terrace up to the Bridge of Remembrance. The terracotta tiles on the highest step have chipped off. The gaps that can be seen on the concrete wall to the right shows how far the steps have moved from their original position.
Damage to the front gable of the Durham Street Methodist Church. Masonry has fallen from the top of the gable, and the resulting gap has been weather proofed with plywood, tarpaulins and metal tiles. The steel bracing propping the whole front wall can be seen at the bottom of the photograph.