Search

found 2484 results

Articles, UC QuakeStudies

A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.

Images, UC QuakeStudies

A photograph of the cordon on the Gloucester Street bridge near Cambridge Terrace. Wire fencing has been placed across the bridges with signs reading, "Extreme danger, keep out" and "Warning, no public access beyond this point".