A photograph captioned by BeckerFraserPhotos, "A new building replacing a damaged and demolished historic hotel at 192 Moorhouse Avenue".
A building under construction on Colombo Street in Sydenham. In the distance, two murals can be seen on the sides of a building.
A PDF copy of The Star newspaper, published on Friday 14 December 2012.
A photograph of wooden planks used in the construction of Gap Filler's temporary outdoor cinema. The boards have a crown logo painted on them.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Building construction in Edgeware. This will eventually house a SuperValue supermarket, on the fence is a large sign that says 'Kia Kaha Chch'.
The public walking through and taking photographs of the ongoing deconstruction and construction work in the CBD. Two diggers can be seen in the background.
Page 3 of Section A of the Christchurch Press, published on Saturday 20 October 2012.
A PDF copy of The Star newspaper, published on Friday 29 June 2012.
A PDF copy of The Star newspaper, published on Wednesday 28 November 2012.
Construction workers with high visibility clothing and hard hats assemble a crane on High Street to help demolish the Westpac Building. The BNZ building can be seen in the background.
Page 1 of Section A of the Christchurch Press, published on Saturday 15 September 2012.
Page 2 of Section C of the Christchurch Press, published on Saturday 15 September 2012.
Kilmore Street, looking west from Manchester Street. The street has been barred off by wire fencing. A pile of steel, construction equipment and a portaloo sit in front of the cordon.
Demolition along Kilmore Street. A digger can be seen as well as a construction worker with a high hat and high-visibility vest. The rubble has been separated into different piles.
Page 16 of Section A of the Christchurch Press, published on Wednesday 27 June 2012.
Page 5 of Section A of the Christchurch Press, published on Wednesday 28 November 2012.
Page 3 of Section A of the Christchurch Press, published on Monday 22 October 2012.
Page 5 of Section A of the Christchurch Press, published on Tuesday 18 September 2012.
Photograph captioned by BeckerFraserPhotos, "The BNZ building on Armagh Street with the PWC building under construction and Copthorne Hotel being demolished behind. The Forsyth Barr building can also be seen".
Piles of rubble along Kilmore Street. A digger can be seen in the background as well as a construction worker in a hard hat and high-visibility vest. The rubble has been separated into different piles.
Photograph captioned by BeckerFraserPhotos, "The new Westende Jewellers building on the corner of Manchester and Worcester Streets. The former building collapsed in the 4 September 2010 earthquake".
View down Victoria Street with the Casino on the right having some construction working being done, and the deconsruction of the Crowne Plaza Hotel at the end of the street. Flags in Canterbury colours, red and black can be seen on the street lights.
Page 2 of Section A of the Christchurch Press, published on Friday 29 June 2012.
Page 1 of Section A of the Christchurch Press, published on Wednesday 12 December 2012.
A photograph of the south side of the building at 112 Manchester Street. A contemporary billboard for Fortis Construction reads, "Let's build our new city together - kia kaha". It partly obscures an old painted sign for Polson's Decorators and Signwriters, which reads "Protect your investment. Paint your property regularly - and save money".
Damage to the Cathedral of the Blessed Sacrament. Looking through the fence on to the side and front where shipping containers are being used to support the walls. On the cordon are signs that say 'Danger. Demolition in Progress. No Entry', and 'Monitored construction alarms. Site secured. No Unauthorised entry'.
A PDF copy of The Star newspaper, published on Friday 13 July 2012.