Search

found 101 results

Articles, UC QuakeStudies

This study determined areas of different liquefaction susceptibility in Hurunui District based mainly on geological data, with some limited borehole strata interpretation. Geotechnical data was not analysed. This was the same method used in the earthquake hazard assessments for engineering lifelines in other districts in Canterbury. Hurunui District was the first district that a hazard assessment for engineering lifelines was undertaken for (in 2000) and it did not include a liquefaction susceptibility map like the other district earthquake hazard assessments did. There are no recommendations associated with this report. See Object Overview for background and usage information.

Articles, UC QuakeStudies

This report was the first report in the district series, and has a different format to later reports. It includes all natural hazards, not only earthquake hazards. It describes earthquake, flooding, meteorological, landslide and coastal hazards within Hurunui district and gives details of historic events. It includes district-scale (1:250,000) active fault and flood hazard maps. The report describes an earthquake scenario for a magnitude 6.9 earthquake near Cheviot, as well as flooding, meteorological, landslide, coastal erosion, storm surge, and tsunami scenarios.

Articles, UC QuakeStudies

This report was the first report in the district series, and has a different format to later reports. It includes all natural hazards, not only earthquake hazards. It describes earthquake, flooding, meteorological, landslide and coastal hazards within Hurunui district and gives details of historic events. It includes district-scale (1:250,000) active fault and flood hazard maps. The report describes an earthquake scenario for a magnitude 6.9 earthquake near Cheviot, as well as flooding, meteorological, landslide, coastal erosion, storm surge, and tsunami scenarios. See Object Overview for background and usage information.

Articles, UC QuakeStudies

This report describes the earthquake hazard in Ashburton district and gives details of historic earthquakes. It includes district-scale (1:250,000) active fault, ground shaking zone, liquefaction and landslide susceptibility maps. The report describes earthquake scenarios for a magnitude 7.0-7.3 earthquake on the Mt Hutt-Mt Peel Fault Zone and a magnitude 8 Alpine Fault earthquake. See Object Overview for background and usage information.

Articles, UC QuakeStudies

This report describes the earthquake hazard in Selwyn district and gives details of historic earthquakes. It includes district-scale (1:250,000) active fault, ground shaking zone, liquefaction and landslide susceptibility maps. The report describes earthquake scenarios for a magnitude 7.0-7.3 earthquake on the Porters Pass-Amberley Fault Zone and a magnitude 8 Alpine Fault earthquake. See Object Overview for background and usage information.

Articles, UC QuakeStudies

This report describes the earthquake hazard in Timaru district and gives details of historic earthquakes. It includes district-scale (1:250,000) active fault, ground shaking zone, liquefaction and landslide susceptibility maps. The report describes earthquake scenarios for a magnitude 7.0-7.3 earthquake on the Mt Hutt-Mt Peel Fault Zone and a magnitude 8 Alpine Fault earthquake. See Object Overview for background and usage information.

Articles, UC QuakeStudies

This study led on from Earthquake hazard and risk assessment study Stage 1 Part A: Earthquake source identification and characterisation (Pettinga et al, 1998). It used the location and characteristics of active faults in the Canterbury region, and the historic record of earthquakes to estimate levels of ground shaking (MM intensity, peak ground acceleration and spectral accelerations) across Canterbury for different return periods. The study also provided earthquake scenarios for selected towns and cities in Canterbury, and undertook detailed investigations into the largest historic earthquakes in Christchurch and parts of the Canterbury region. See Object Overview for background and usage information.

Articles, UC QuakeStudies

This report assesses issues and options for preparing an earthquake hazard and risk assessment programme for Canterbury. It outlines investigation options and associated costs in order to better understand Canterbury's earthquake hazard and risk. Although earthquake hazard and risk information needs and investigation priorities within Canterbury have changed over the past 15 years, the majority of the report’s recommended components have been undertaken to some degree either by Environment Canterbury or other organisations. See Object Overview for background and usage information.

Videos, UC QuakeStudies

A video of a presentation by Jane Murray and Stephen Timms during the Social Recovery Stream of the 2016 People in Disasters Conference. The presentation is titled, "Land Use Recovery Plan: How an impact assessment process engaged communities in recovery planning".The abstract for this presentation reads as follows: In response to the Canterbury earthquakes, the Minister for Canterbury Earthquake Recovery directed Environment Canterbury (Canterbury's regional council) to prepare a Land Use Recovery Plan that would provide a spatial planning framework for Greater Christchurch and aid recovery from the Canterbury earthquakes. The Land Use Recovery Plan sets a policy and planning framework necessary to rebuild existing communities and develop new communities. As part of preparing the plan, an integrated assessment was undertaken to address wellbeing and sustainability concerns. This ensured that social impacts of the plan were likely to achieve better outcomes for communities. The process enabled a wide range of community and sector stakeholders to provide input at the very early stages of drafting the document. The integrated assessment considered the treatment of major land use issues in the plan, e.g. overall distribution of activities across the city, integrated transport routes, housing typography, social housing, employment and urban design, all of which have a key impact on health and wellbeing. Representatives from the Canterbury Health in All Policies Partnership were involved in designing a three-part assessment process that would provide a framework for the Land Use Recovery Plan writers to assess and improve the plan in terms of wellbeing and sustainability concerns. The detail of these assessment stages, and the influence that they had on the draft plan, will be outlined in the presentation. In summary, the three stages involved: developing key wellbeing and sustainability concerns that could form a set of criteria, analysing the preliminary draft of the Land Use Recovery Plan against the criteria in a broad sector workshop, and analysing the content and recommendations of the Draft Plan. This demonstrates the importance of integrated assessment influencing the Land Use Recovery Plan that in turn influences other key planning documents such as the District Plan. This process enabled a very complex document with wide-ranging implications to be broken down, enabling many groups, individuals and organisations to have their say in the recovery process. There is also a range of important lessons for recovery that can be applied to other projects and actions in a disaster recovery situation.

Articles, UC QuakeStudies

This report describes the earthquake hazard in Waimate and Mackenzie districts and the part of Waitaki district within Canterbury, and gives details of historic earthquakes. It includes district-scale (1:500,000) active fault, ground shaking zone, liquefaction and landslide susceptibility maps. The report describes earthquake scenarios for a magnitude 7.2-7.4 Ostler Fault earthquake near Twizel, a magnitude 8 Alpine Fault earthquake, and a magnitude 6.9 Hunters Hills Fault Zone earthquake near Waimate. See Object Overview for background and usage information.

Images, UC QuakeStudies

Structural Engineers from the New Zealand and Los Angeles County Fire Department Urban Search and Rescue teams performing assessments of buildings on High Street near Manchester Street.

Images, UC QuakeStudies

Structural Engineers from the New Zealand and Los Angeles County Fire Department Urban Search and Rescue teams performing an assessment of the Kenton Chambers Building on Hereford Street.

Images, UC QuakeStudies

Structural Engineers from the New Zealand and Los Angeles County Fire Department Urban Search and Rescue teams performing an assessment of the Kenton Chambers Building on Hereford Street.

Images, UC QuakeStudies

The Asko Design store on Victoria Street has been given a yellow sticker. This was a building assessment system used following the February earthquake and indicates that this building has limited access and needs further evaluation.

Images, UC QuakeStudies

The Surreal Hair & Beauty store on Victoria Street has been given a yellow sticker. This was a building assessment system used following the February earthquake and indicates that this building has limited access and needs further evaluation.

Images, UC QuakeStudies

The Surreal Hair & Beauty store on Victoria Street has been given a yellow sticker. This was a building assessment system used following the February earthquake and indicates that this building has limited access and needs further evaluation.

Images, UC QuakeStudies

USAR codes and a yellow sticker can be seen on the doors of a damaged building. The yellow sticker was part of a building assessment system used following the February earthquake and indicates that this building has limited access and needs further evaluation.

Images, UC QuakeStudies

A building on Victoria Street, housing the Chinwag Eathai restaurant, that has been give a yellow placard. This was a building assessment system used following the February earthquake indicating that there should be limited access and that the building needs further evaluation.

Videos, UC QuakeStudies

A video of the controlled explosion of a 40-tonne boulder above the Summit Road. The boulder is being removed using explosives after an assessment by United Research Services found that the rocks supporting the boulder have become unsafe.