Photograph captioned by BeckerFraserPhotos, "Looks as if they are building a platform for the high reach to work on the Grant Thornton building. Cathedral Square".
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Three volunteers putting the roof together.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men nail the walls together.
A photograph of performers in the Free Theatre performance of 'The Earthquake in Chile'. The performance is taking place in St Mary's Square.
The Hamish Hay Bridge in Victoria Square with the Crowne Plaza Hotel in the background. The bottom of the hotel has been stripped out and prepared for demolition.
Photograph captioned by BeckerFraserPhotos, "St John the Baptist, Latimer Square".
Photograph captioned by BeckerFraserPhotos, "Demolition site of Regent Theatre, Cathedral Square with Clarendon Towers behind".
Aerial image of Cathedral Square taken by the Royal New Zealand Air Force for the Earthquake Commission. The damaged Press Building can be seen.
Photograph captioned by BeckerFraserPhotos, "The Grant Thornton building in Cathedral Square. The owners and insurers are still trying to decide what is happening to it".
Rubble and wreckage in Cathedral Square.
The BNZ building in Cathedral Square.
The Chalice sculpture in Cathedral Square.
The BNZ building in Cathedral Square.
Scaffolding at the front of the badly damaged Christ Church Cathedral.
Scaffolding at the front of the badly damaged Christ Church Cathedral.
Scaffolding at the front of the badly damaged Christ Church Cathedral.
Scaffolding at the front of the badly damaged Christ Church Cathedral.
Scaffolding at the front of the badly damaged Christ Church Cathedral.
Scaffolding at the front of the badly damaged Christ Church Cathedral.
Scaffolding at the front of the badly damaged Christ Church Cathedral.
Scaffolding at the front of the badly damaged Christ Church Cathedral.
Al Dwyer, leader of the USAID Disaster Assistance Response Team (DART), outside the US headquarters in Latimer Square. Members of DART can be seen behind him. Latimer Square was set up as a temporary headquarters for emergency management personnel after the 22 February 2011 earthquake.
Prime Minister John Key preparing for a photograph with Al Dwyer, the leader of the USAID Disaster Assistance Response Team (DART), and members of DART, outside the US headquarters in Latimer Square. Latimer Square was set up as a temporary headquarters for emergency managements personnel after the 22 February 2011 earthquake.
An aerial photograph of Cathedral Square. Captions added by BeckerFraserPhotos identify the demolition sites of key buildings.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team walking down Gloucester Street towards Latimer Square. To the right, shipping containers have been stacked beside the square. A cordon of wire fences and road cones have also been used to cordon off the street in the distance.
An archaeological report compiled for New Zealand Historic Places Trust under the Historical Places Act 1993
A photograph of the 'Thinking Outside the Square' installation in the window of the Beggs Music building on Colombo Street.
A photograph of the 'Thinking Outside the Square' installation in the window of the Beggs Music building on Colombo Street.
An archaeological report compiled for New Zealand Historic Places Trust under the Historical Places Act 1993
An archaeological report compiled for New Zealand Historic Places Trust under the Historical Places Act 1993