A photograph captioned by BeckerFraserPhotos, "A new front being built on 514 Colombo Street".
A photograph captioned by BeckerFraserPhotos, "Concrete being poured in a new building in Colombo Street".
A video of Emily Marriot, from Corbel Construction, and Agata Bulksa, from Kirk Roberts Engineers, taking part in a boxing match as part of the Battle of the Rebuild fight night. The Battle of the Rebuild bought together major construction and engineering companies involved in the rebuild of Christchurch. The event raised more than $169,000 for the Aranui and Linwood College Breakfast Club, the Champion Centre, and the Canterbury Youth Development Programme Trust.
Photograph captioned by BeckerFraserPhotos, "New construction on the corner of Colombo and Kilmore Streets".
A video of architect Shigeru Ban overseeing the construction of the cardboard beams which will be used to build the Transitional Cathedral on Hereford Street. The video includes an interview with Ban about the beams, and the ways that the design has changed since the construction started.
A video of an interview with Wendy Rushworth, whose house was fenced off despite not being scheduled for demolition. Falcon Construction accidently added Rushworth's property to a list of homes ready for demolition. The company has since apologised to Rushworth and removed the fencing.
A photograph of a concrete mixer. The photograph is captioned by BeckerFraserPhotos, "The old and the new in Colombo Street".
Page 2 of Section A of the Christchurch Press, published on Tuesday 26 June 2012.
Construction vehicles levelling a bank beside the Kaiapoi River in Kaiapoi to be laid with a new footpath.
Photograph captioned by BeckerFraserPhotos, "New construction of residential units at the Linwood Village, 402 Worcester Street".
A document which describes how the new Beachville Road seawall was built.
A graphic listing skills shortages in Christchurch.
A table comparing concrete use in Auckland and Christchurch.
A new building under construction on Kilmore Street. A sign reading, 'Danger keep out' has been placed on the security fence.
A photograph of a partially-constructed building. The photograph is captioned by BeckerFraserPhotos, "Rebuilding, Salisbury Street".
A video of a media tour inside the earthquake-damaged Hotel Grand Chancellor. The video includes footage of the eastern side of the ground floor of the hotel, the stairwells, some of the rooms, and the view through an opening in the side of the building. It also includes an interview with Jack Harris from Fletchers Construction about the work that is being done to support the structure.
Page 4 of Section A of the Christchurch Press, published on Tuesday 11 December 2012.
A paper presented at the New Zealand Concrete Industry Conference 2015 about the design and construction challenges faced when strengthening the Memorial Arch.
A graph showing economic recovery in Canterbury.
An infographic giving statistics on workers arriving in Canterbury from overseas.
A photograph captioned by BeckerFraserPhotos, "A new building replacing a damaged and demolished historic hotel at 192 Moorhouse Avenue".
A video of an interview with Earthquake Recovery Minister Gerry Brownlee and Frank Delli Cicchi, the Grand Central Group Australian and New Zealand general manager, about the demolition of the Hotel Grand Chancellor. The Grand Chancellor is the tallest building in Christchurch, and was severely damaged during the 22 February 2011 earthquake. Fletcher Construction have been chosen to demolish the building.
A photograph captioned by BeckerFraserPhotos, "The site of the demolished Piko Cafe, now operating just from the new piece on the left. Corner of Kilmore and Barbadoes Streets".
A photograph captioned by BeckerFraserPhotos, "Brick cladding covering up concrete slab - strong and attractive! Montreal Street".
Photograph captioned by BeckerFraserPhotos, "University grounds, College House, and Bishop Julius hall of residence, with the new supermarket under construction at centre right".
Page 3 of Section A of the Christchurch Press, published on Monday 11 August 2014.
Page 3 of Section A of the Christchurch Press, published on Saturday 20 October 2012.
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Construction workers are kept busy moving scaffolding and fixtures".
Page 1 of Section A of the Christchurch Press, published on Saturday 15 September 2012.
Page 2 of Section C of the Christchurch Press, published on Saturday 15 September 2012.