Search

found 101 results

Articles, UC QuakeStudies

This study updated the 1999 Earthquake hazard and risk assessment study Stage 1 Part B: Probabilistic seismic hazard assessment and Earthquake scenarios for the Canterbury region, and historic earthquakes in Christchurch report. It incorporated new fault data, a new distributed seismicity model and new methods for estimating Modified Mercalli intensities. See Object Overview for background and usage information.

Articles, UC QuakeStudies

An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.

Images, UC QuakeStudies

A Civil Defence staff member completing a Level 1 Rapid Assessment inspection form for a damaged house. Some of the brickwork has collapsed from the outer wall and the awnings over the windows have collapsed.

Images, UC QuakeStudies

A Civil Defence staff member completing a Level 1 Rapid Assessment inspection form for a damaged house. Some of the brickwork has collapsed from the outer wall of the house and the awnings over the windows have collapsed.

Articles, UC QuakeStudies

This report describes the earthquake hazard in Kaikoura district and gives details of historic earthquakes. It includes district-scale (1:250,000) active fault, ground shaking zone, liquefaction and landslide susceptibility maps. The report describes an earthquake scenario for a magnitude 7.0-7.3 Hope Fault earthquake near Kaikoura, and a subsequent local tsunami.

Videos, UC QuakeStudies

Part seven of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.

Videos, UC QuakeStudies

Part two of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.

Videos, UC QuakeStudies

Part six of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.

Videos, UC QuakeStudies

Part five of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.

Images, UC QuakeStudies

A Civil Defence staff member talking on his cell phone, he is holding clipboard with a form titled 'Christchurch Eq rapid assessment form level 1'. The brickwork of the house has crumbled and the broken windows have been boarded up.

Videos, UC QuakeStudies

Part four of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.

Videos, UC QuakeStudies

Part three of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.

Videos, UC QuakeStudies

Part one of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.