"Training and Education of Engineers and Organisation of Engineering Profession and Building Assessment after Earthquakes", a report submitted by the then New Zealand Historic Places Trust on the Royal Commission Discussion Papers.
This study updated the 1999 Earthquake hazard and risk assessment study Stage 1 Part B: Probabilistic seismic hazard assessment and Earthquake scenarios for the Canterbury region, and historic earthquakes in Christchurch report. It incorporated new fault data, a new distributed seismicity model and new methods for estimating Modified Mercalli intensities. See Object Overview for background and usage information.
An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.
A Civil Defence staff member completing a Level 1 Rapid Assessment inspection on a damaged house. The brickwork and window have collapsed from the outer wall of the property.
A Civil Defence staff member completing a Level 1 Rapid Assessment inspection on a damaged house. The brickwork has crumbled and the broken windows have been boarded up.
Object Overview of 'Earthquake hazard and risk assessment study Stage 1 Part A: Earthquake source identification and characterisation'.
Object Overview of 'Assessment of active fault and fold hazards in the Twizel area, Mackenzie District, South Canterbury (Barrell, 2010).'
A Civil Defence staff member completing a Level 1 Rapid Assessment inspection on a damaged house. The brickwork on the outer walls have collapsed. The window on the left hand side has been broken.
A page banner promoting an article about land damage assessment.
A page banner promoting an article about land damage assessment.
A diagram which shows outputs from PDAT (with explanations).
A diagram which shows outputs from PDAT calibration/validation (with explanations).
A Civil Defence staff member completing a Level 1 Rapid Assessment inspection form for a damaged house. Some of the brickwork has collapsed from the outer wall and the awnings over the windows have collapsed.
A Civil Defence staff member completing a Level 1 Rapid Assessment inspection form for a damaged house. Some of the brickwork has collapsed from the outer wall of the house and the awnings over the windows have collapsed.
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
This report describes the earthquake hazard in Kaikoura district and gives details of historic earthquakes. It includes district-scale (1:250,000) active fault, ground shaking zone, liquefaction and landslide susceptibility maps. The report describes an earthquake scenario for a magnitude 7.0-7.3 Hope Fault earthquake near Kaikoura, and a subsequent local tsunami.
This report describes the earthquake hazard in Waimakariri district and gives details of historic earthquakes. It includes district-scale (1:250,000) active fault, ground shaking zone, liquefaction and landslide susceptibility maps. See Object Overview for background and usage information.
A photograph of a rapid assessment lecture being presented to workers.
Part seven of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.
Part two of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.
Part six of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.
Part five of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.
A Civil Defence staff member talking on his cell phone, he is holding clipboard with a form titled 'Christchurch Eq rapid assessment form level 1'. The brickwork of the house has crumbled and the broken windows have been boarded up.
Part four of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.
Part three of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.
A table showing the results of Christchurch City Council's Detailed Engineering Evaluation assessments.
A photograph of the first page of a copy of a Level 1 Rapid Assessment Form. The form was used by the Civil Defence to document the earthquake damage to buildings in central Christchurch after the 22 February 2011 earthquake.
A photograph of the second page of a copy of a Level 2 Rapid Assessment Form. The form was used by the Civil Defence to document the earthquake damage to buildings in central Christchurch after the 22 February 2011 earthquake.
A photograph of the third page of a copy of a Level 2 Rapid Assessment Form. The form was used by the Civil Defence to document the earthquake damage to buildings in central Christchurch after the 22 February 2011 earthquake.
Part one of a video series about the first stage of the Tonkin & Taylor Geotechnical Land Damage Assessment and Reinstatement Report. The report was prepared for the Earthquake Commission after the 4 September 2010 earthquake.