Construction work taking place at the Oval Village.
Construction of classrooms continues at the Oval Village.
A photograph of two windows of 26 Canterbury Street in Lyttelton.
A photograph of a detail of 26 Canterbury Street in Lyttelton.
A photograph of a detail of 26 Canterbury Street in Lyttelton.
A photograph of the damaged Canterbury Hotel building. The photograph is captioned by BeckerFraserPhotos, "Norwich Quay, Lyttelton".
An advertisement for 'The Pledge for Canterbury' campaign advising that The Pledge can be signed at Northlands Shopping Centre.
Pages 6 and 7 of a Canterbury Home Show advertising feature in the Christchurch Press, published on Saturday 10 December 2011.
Photo of Helen Sellwood's office in Level 3 of Aoraki Building taken by Neville Weavers, 1 April 2011.
A photograph of equipment from the New Zealand Fire Service Urban Search and Rescue team on display in the Canterbury Quakes exhibition at the Canterbury Museum. The equipment was used during the emergency response to the 22 February 2011 earthquake.
A photograph submitted by Bettina Evans to the QuakeStories website. The description reads, "The gate of the Convent of Mercy, Lyttelton, cnr. Canterbury Str./Exeter Str., Sept. 2011".
Photograph captioned by BeckerFraserPhotos, "Very old gas lamp in Cambridge Terrace outside the Canterbury Club".
An aerial photograph of Christ's College, the Canterbury Museum and the Botanic Gardens.
A worker examines paperwork in the James Hight Library.
Penguins Quakey and Shakey inside the NZI3 building.
Members of the recovery team outside the Registry Building.
Spice Traders is open again following the February earthquake.
Staff in the engineering building begin to clean up.
Penguin Quakey watched over while somebody works on campus.
Construction of the temporary classrooms on the Ilam Oval.
A digger moving around earth on the Ilam Oval.
Rows of classrooms, almost completed in the Ilam Oval.
Construction of the temporary classrooms on the Ilam Oval.
Rows of classrooms, almost completed in the Ilam Oval.
The foyer under the library before changes were made.
Rows of classrooms, almost completed in the Ilam Oval.
Rows of classrooms, almost completed in the Ilam Oval.
Workers laying tiles on the walkway under the library.
Construction of the temporary classrooms on the Ilam Oval.
KC Five, a class room in the Kirkwood Village.