Search

found 52508 results

Images, UC QuakeStudies

A photograph of earthquake damage to a building on the corner of Tuam Street and Madras Street. The top corner of the façade has crumbled, and the bricks have fallen onto the footpath below. The building has been cordoned off by wire fencing and the road is closed.

Images, UC QuakeStudies

A photograph of workers from the Residential Access Project standing on High Street near the intersection with Tuam Street. In the background, a trailer is being loaded with items salvaged from people's homes during the project which gave residents temporary access to the cordon to retrieve items from their homes.

Images, UC QuakeStudies

A photograph of workers in fluorescent vests outside Alice in Videoland. The photograph was taken on 29 April 2011 during the Residential Access Project which gave residents temporary access within the red-zone cordon in order to retrieve items from their homes after the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph looking east along Tuam Street towards the intersection of Colombo Street. The badly-damaged Bean Bags and Beyond building at 626 Colombo Street can be seen on the right hand side. In front of it is the remains of the Leather Direct building (615 Colombo Street).

Images, UC QuakeStudies

A photograph of St Elmo Courts on the corner of Hereford and Montreal Streets. Cracks can be seen between the windows of the building and wire fencing has been placed around the bottom as a cordon. Two workers in hard hats in visibility vests are examining the building from street level.

Images, UC QuakeStudies

A photograph of Andrew Just of F3 Design giving a talk about ArtBox on the corner of St Asaph Street and Madras Street. The photograph was taken during a public talk about the temporary studio and gallery space. The event was part of FESTA 2012.

Images, UC QuakeStudies

A powhiri performed by Ngai Tahu elders to welcome workers of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Phil Goff is standing in the centre of the group that is being welcomed. The ceremony was held in Burwood Park.

Images, UC QuakeStudies

Christchurch Mayor Bob Parker handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Earthquake Recovery Minister Jerry Brownlee and a contractor are looking on.

Images, UC QuakeStudies

Christchurch Mayor Bob Parker handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Earthquake Recovery Minister Jerry Brownlee and a contractor are looking on.

Images, UC QuakeStudies

Christchurch Mayor Bob Parker handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Earthquake Recovery Minister Jerry Brownlee and a contractor are looking on.

Images, UC QuakeStudies

Christchurch Mayor Bob Parker handling a jackhammer on Kingsford Street in Burwood. This was part of the opening of the Stronger Christchurch Infrastructure Rebuild Team (SCIRT). Earthquake Recovery Minister Jerry Brownlee and a contractor are looking on.

Images, UC QuakeStudies

Civil Defence staff walking down Durham Street, a fire engine behind them. Beside them, the damaged Provincial Council Legislative Chamber can be seen. The building's roof and walls have collapsed, as has the scaffolding that had been erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

A panoramic photograph taken at the front of Christ Church Cathedral. The front of the cathedral has steel bracing against it to limit further damage. The upper part of the front wall has crumbled completely, exposing the inside space. The Chalice sculpture is to the right and the BNZ building can be seen in the background.

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "The Heathcote Valley entrance to the Bridal Track to Lyttelton was closed for a year because of the danger of falling rocks. It opened on the morning of December 23. The earthquake at lunchtime then closed it again when more rocks fell".