A road worker standing next to a 'Road closed' sign on Antigua Street. In the distance, dust is rising from road repairs. To the right, a brick fence has collapsed.
A photograph of a sign reading, "Church building under repair, worshipping in parish centre." The photograph is captioned by BeckerFraserPhotos, "Riccarton St James Anglican Church, 69 Riccarton Road".
A presentation prepared by one of the site engineers restoring the Memorial Arch and Bridge of Remembrance, outlining the damage to the structures, the repair designs and the construction methodologies.
The Pacific Tower building on Gloucester Street, with repairs to cracks visible down one side. Constructed in 2010, the Pacific Tower was at the time the tallest building in Christchurch.
A crane sits beside the sewage treatment ponds in Bromley. In the distance can be seen large piles of liquefaction silt. The photographer comments, "Bromley sewage treatment ponds, under repair".
A photograph submitted by Grant Fife to the QuakeStories website. The description reads, "Canterbury Provincial Chambers 03/04/2011. This building was being stabilised and repaired after the September quake.".
A photograph captioned, "After the September earthquake, it was more a simple case of something gets broken and it gets repaired. Then came February, and June as well, and suddenly it's just not so straightforward anymore".
Photograph captioned by BeckerFraserPhotos, "The Cathedral of the Blessed Sacrament on Barbadoes Street".
A pile of gravel and tarseal in front of a house in Richmond during repairs to River Road. The photographer comments, "Our house was becoming progressively more shattered with each aftershock".
A pile of gravel and tarseal in front of a house in Richmond. The photographer comments, "River Rd repairs. We weren't living in our house, we'd moved out after the September 2010 shake".
Photograph captioned by Fairfax, "Holy Trinity Church on Winchester Street in Lyttelton. The crack in the interior wall of the church by stained glass window will cost at least one million to repair".
A photograph of the damaged Provincial Council Chambers on Durham Street. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.
Photograph captioned by BeckerFraserPhotos, "the Edmonds Clock Tower heavily braced. (time stopped at 12:51, the moment of the Feb 22, 2011 earthquake) (the tower has subsequently been partly deconstructed for repair )".
Photograph captioned by Fairfax, "Furniture maker Bertram Rush and his building survived the earthquake. He's still open, hearing from people with damaged cabinets, and has been busy helping a customer to repair his home".
A view across Manchester Street to the Octagon Live Restaurant (formerly Trinity Church), which is being repaired. One of the building's windows has been boarded up with plywood, and its base is enclosed in a security fence.
Scaffolding erected around St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets to enable repairs to be made to the building. The church was damaged in the 4 September 2010 earthquake.
Scaffolding erected around St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets to enable repairs to be made to the building. The church was damaged in the 4 September 2010 earthquake.
Scaffolding erected around St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets to enable repairs to be made to the building. The church was damaged in the 4 September 2010 earthquake.
A view across Madras Street to St Pauls Trinity-Pacific Presbyterian Church. Scaffolding has been constructed around the building to enable repairs to be made. The church was damaged in the 4 September 2010 earthquake.
Scaffolding erected around St Pauls Trinity-Pacific Presbyterian Church on the corner of Cashel and Madras Streets to enable repairs to be made to the building. The church was damaged in the 4 September 2010 earthquake.
A photograph of a badly-damaged building on Manchester Street, which previously housed the Treehouse bar and nightclub. The roof and second storey of the building have been temporarily repaired and the building is fenced off.
A photograph of a room in the Diabetes Centre which has been prepared for repairs. The furniture has been stacked one side of the room and plastic sheeting has been used to cover the carpet.
A portaloo sits outside a house on River Road. The road is under repair, and the tarmac has been removed leaving a gravel surface. The photographer comments, "Our old house was given a portaloo; I'm not sure why".
Photograph captioned by BeckerFraserPhotos, "The site of the Strange's building on the north-west corner of Lichfield and High Streets. Bonnington House can also be seen, covered with scaffolding during the repair process".
A photograph of a room in the Diabetes Centre which has been prepared for repairs. The moveable stacks and counter have been covered in plastic sheeting and a tarpaulin has been draped over the carpet.
A fire engine driving past the damaged Provincial Council Legislative Chamber on Durham Street. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.
A video of excavators demolishing the former railway station on Moorhouse Avenue. The building was only moderately damaged during the 22 February 2011 earthquake, but repair work was deemed too costly for the co-owner, Science Alive!.
The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September earthquake.
The University of Canterbury's E-Learning team's temporary office in the James Hight building. The photographer comments, "Yet another change of workplace for our E-Learning group, as the University juggles people and buildings to carry out earthquake repairs. My desk".
A photograph of an office in the Diabetes Centre which has been prepared for earthquake repair work. Furniture and other office materials have been stacked in the corner of the room. Several tiles are missing from the ceiling above.