Text reads 'Parking wardens resume work in Christchurch'. A parking warden peers anxiously at a huge tanker named 'Bill's Septic Tank Services' which is apparently parked illegally. The driver of the tanker, who holds the nozzle of a pump attached to the tank, says 'Your move!' suggesting the threat of a sewage spill if the warden insists on compliance. Context - 'After a lengthy grace period following the devastating February 22 quake, Parking wardens were yesterday on the hunt for parking infringers in the city's non-metered time-restricted zones, loading zones, bus/tour coach stops and taxi stands, and on the likes of broken yellow lines.' The resumption of work by the parking wardens does suggest a return to normal in Christchurch. (NZHerald 30 May 2011)
Colour and black and white versions available
Quantity: 2 digital cartoon(s).
Earthquake damage to the road from Cheviot to Port Robinson, 1901. Taken by an unidentified photographer.
This is a copy of a photograph from `The Weekly Press', Nov 27, 1901
Note on back of file print reads: "Fissures on the road from Cheviot to Port Robinson. There is a creek on the right side of the road, and below the fissure the road has fallen towards it.....and is 2 1/2' below its proper level. The fissures are 2 1/2' deep" (Probably the caption from `The Weekly Press')
Quantity: 1 b&w original negative(s).
Christ Church Cathedral, Christchurch, with spire being rebuilt after the 1901 earthquake. Photographer unidentified.
The nave, tower and spire of Christchurch Cathedral was completed in 1881. Work on completeing the rest of the building began in 1900. In 1902 the transcepts were finished and work started on the chancel and apse. An earthquake in 1901 cracked the upper part of the spire in two places. In this photograph which dates from late 1902/1903 (see scaffolding beyond the transcept indicating work on chancel) the upper part of the spire has been removed by Messrs Graham and Greig in preparation for replacing this section with a copper covered wooden structure. The Cathedral was completed in 1904.
(Information from "Vision and Reality; Christchurch Cathedral in the Square," Colin Brown, Christchurch, 2000 and "A Dream of Spires," Ian Lochhead, Canterbury University Press, 1999, page 153.)
Preparation for erecting the scaffolding was reported in the Christchurch Star 15 January 1902. The cross was replaced on the top of the new copper covered wooden section of the spire on 29 June 1903.
Source of descriptive information - Notes on file print.
Source of title - Title supplied by Library
Quantity: 1 b&w original negative(s).
Physical Description: Glass negative