Search

found 10 results

Videos, UC QuakeStudies

A video showing engineers removing the latticework from the top of the Press Building in Cathedral Square. The latticework is being removed after engineers discovered it was being held onto the building by only two bolts. The bolts are no bigger than a little finger.

Videos, UC QuakeStudies

A video of an interview with Chris Bartholomeusz, Construction Manager at Downer Construction, about the work the team has been doing to stabilise a former quarry on Gleaning Spur. More than 12,000 cubic metres of soil have been removed from the hillside in order to remove a risk of a landslide hitting the houses below.

Videos, UC QuakeStudies

A video taken from a vehicle showing slow-moving heavy traffic following the 22 February 2011 earthquake. Note that the audio has been removed from this video for copyright reasons.

Videos, UC QuakeStudies

A video of the controlled explosion of a 40-tonne boulder above the Summit Road. The boulder is being removed using explosives after an assessment by United Research Services found that the rocks supporting the boulder have become unsafe.

Videos, UC QuakeStudies

A video about the removal of the dome of the Cathedral of the Blessed Sacrament on Barbadoes Street. The dome is being removed in order to take weight off the building and help stabilise the lower sections.

Videos, UC QuakeStudies

A video of an interview with Wendy Rushworth, whose house was fenced off despite not being scheduled for demolition. Falcon Construction accidently added Rushworth's property to a list of homes ready for demolition. The company has since apologised to Rushworth and removed the fencing.

Videos, UC QuakeStudies

A video of Stone Works removing a time capsule from the foundations of the old Press Building in Cathedral Square. The time capsule was found in the foundation stone of the building. It contained a bundle of newspapers from April 1907, handwritten notes, and coins.

Videos, UC QuakeStudies

A video about engineers recovering the internal copper dome of the Cathedral of the Blessed Sacrament by lifting it out in one piece. The dome was undamaged after the 22 February 2011 earthquakes, but lost most of its supporting columns. Engineers have decided to remove the dome to ensure it will not be damaged during further aftershocks.

Videos, UC QuakeStudies

A video of the removal of the earthquake-damaged Medway Street bridge from the banks of the Avon River. The video shows members of the Stronger Christchurch Infrastructure Rebuild Team removing the bridge and preparing it for transport to the Ferrymead Heritage Park. It will remain at the park until a permanent home can be found for it as an earthquake memorial.

Videos, NZ On Screen

New Zealand television's longest running children's show turns 30 with a two hour live extravaganza — far removed from its modest, half hour beginnings back in 1981. Current hosts Charlie, Johnson and Gem are joined by a parade of past presenters who reminisce, and compete to find the show's best decade. Masterchef finalist Jax Hamilton provides snacks, and celebrities send greetings. In amongst the cupcakes, gunge, fart jokes and mayhem, the programme enters its fourth decade as an institution, watched by the children of its original audience.