Search

found 3 results

Videos, UC QuakeStudies

A video showing engineers removing the latticework from the top of the Press Building in Cathedral Square. The latticework is being removed after engineers discovered it was being held onto the building by only two bolts. The bolts are no bigger than a little finger.

Videos, UC QuakeStudies

A video of an interview with Andrew Holden, Editor of The Press, about the 4 September 2010 earthquake. Holden talks about the status of the Press Building in Cathedral Square, The Press's temporary offices in the Novotel hotel, and the importance of newspapers in a post-disaster zone.

Videos, UC QuakeStudies

A video of a press conference with Mayor Bob Parker, Roger Sutton (CEO of Orion), Superintendent Dave Cliff (Christchurch Police), and Chief Fire Officer Dan Coward. The speakers talk about the work that is being done to bring power back to Christchurch residents, and to assess the safety of buildings in the Christchurch central city.