A public talk by Helina Stil, South Island Manager at Nikau Contractors. This talk, entitled 'Deconstruction to construction', formed part of the Plenary Two session, 'Clearing the decks'.
A video of an interview with Chris Bartholomeusz, Construction Manager at Downer Construction, about the work the team has been doing to stabilise a former quarry on Gleaning Spur. More than 12,000 cubic metres of soil have been removed from the hillside in order to remove a risk of a landslide hitting the houses below.
A video of Emily Marriot, from Corbel Construction, and Agata Bulksa, from Kirk Roberts Engineers, taking part in a boxing match as part of the Battle of the Rebuild fight night. The Battle of the Rebuild bought together major construction and engineering companies involved in the rebuild of Christchurch. The event raised more than $169,000 for the Aranui and Linwood College Breakfast Club, the Champion Centre, and the Canterbury Youth Development Programme Trust.
A video of architect Shigeru Ban overseeing the construction of the cardboard beams which will be used to build the Transitional Cathedral on Hereford Street. The video includes an interview with Ban about the beams, and the ways that the design has changed since the construction started.
A video of an interview with Wendy Rushworth, whose house was fenced off despite not being scheduled for demolition. Falcon Construction accidently added Rushworth's property to a list of homes ready for demolition. The company has since apologised to Rushworth and removed the fencing.
A video of the first part of a series of talks on the topic of Planning and People, at the 2012 Seismics and the City forum. The talks are as follows: Mary Devine, Managing Director of Ballantyne and Co, on Anchoring Re:START and holding the centre; Anthony Leighs, Chief Executive of Leighs Construction, on Deconstruction and Reconstruction; and Sam Johnson, founder of the Student Volunteer Army, on Mobilising a Quick Response.
A video of the second part of a series of talks on the topic of Planning and People, at the 2012 Seismics and the City forum. The talks are as follows: Mary Devine, Managing Director of Ballantyne and Co, on Anchoring Re:START and holding the centre; Anthony Leighs, Chief Executive of Leighs Construction, on Deconstruction and Reconstruction; and Sam Johnson, founder of the Student Volunteer Army, on Mobilising a Quick Response
A video of a media tour inside the earthquake-damaged Hotel Grand Chancellor. The video includes footage of the eastern side of the ground floor of the hotel, the stairwells, some of the rooms, and the view through an opening in the side of the building. It also includes an interview with Jack Harris from Fletchers Construction about the work that is being done to support the structure.
A video of an interview with Earthquake Recovery Minister Gerry Brownlee and Frank Delli Cicchi, the Grand Central Group Australian and New Zealand general manager, about the demolition of the Hotel Grand Chancellor. The Grand Chancellor is the tallest building in Christchurch, and was severely damaged during the 22 February 2011 earthquake. Fletcher Construction have been chosen to demolish the building.
A video of a CTV News broadcast of a Ministry of Women's Affairs initiative to attract more women into trades and construction related jobs.
A time-lapse video documenting the construction of Gap Filler's Pallet Pavilion. The video is made up of photographs taken from the top of the Christchurch Casino.
A video montage of LUXCITY, a city of lights that existed for one night on Saturday 20 October 2012. LUXCITY was the main event of FESTA 2012 and included 16 interactive installations, designed and fabricated by architecture and design students from across New Zealand. The film depicts the construction and set up, through to the public event on Saturday night.
A video montage of Canterbury Tales, a carnivalesque procession through the central city, led by Free Theatre Christchurch. The film depicts the construction and set up, through to the main public events. It also includes interviews with Peter Faulkenberg (Canterbury Tales and Free Theatre Christchurch Artistic Director) and George Parker (Canterbury Tales and Free Theatre Christchurch Producer).
A video of an address by Michael Rouse, National Lead at Deloitte Australia, at the 2014 Seismics and the City forum. This talk was part of the Building Confidence section, and covered the role of the external advisory in project execution and construction management in terms of ensuring best practice and cost savings.
A video about members of the Irish rugby team touring the Christchurch central city Red Zone. The team is in Christchurch for a test match against the All Blacks at the new Christchurch Stadium. The video includes interviews with scrum coach Greg Feek and coach Declan Kidney. It also includes footage of Irish construction workers meeting the team in Cathedral Square.
A video of Press journalist Martin Van Beynen talking about the Canterbury Television Building which collapsed during the 22 February 2011 earthquake. Beynen investigates the construction manager of the building, Gerald Shirtcliff, who allegedly faked an engineering degree and stole the identity of an engineer he knew in South Africa. The video also includes footage of Shirtcliff giving evidence about the CTV Building at the Canterbury Earthquake Royal Commission.
A video of a tour through the Christchurch central city Red Zone. The video includes footage of Armagh Street, Madras Street, Latimer Square, St John's Anglican Church, Hereford Street, the Octagon Live restaurant, the Design and Arts building, the High Street mall, and the Grand Chancellor Hotel. It also includes footage of construction workers cutting up metal beams, and clearing rubble from a building on Manchester Street.
A video of an interview with Julia Morison, a Christchurch-based artist, about her sculptures in a vacant site on the Christchurch central city. The artwork, titled 'Tree Houses for Swamp Dwellers', took over a year to make and will act as a centrepiece for the Scape Public Art festival, which begins on 27 September 2013. The sculpture was designed to provide a playground for children and a shady spot for workers on their lunch breaks. Morison also talks about how the sculpture was designed to be relocated and reconfigured so that it can be moved to a new location when construction begins on the vacant site.