On 22 February 2011,a magnitude Mw 6.3 earthquake occurred with an epicenter located near Lyttelton at about 10km from Christchurch in Canterbury region on the South Island of New Zealand (Figure 1). Since this earthquake occurred in the midst of the aftershock activity which had continued since the 4 September 2010 Darfield Earthquake occurrence, it was considered to be an aftershock of the initial earthquake. Because of the short distance to the city and the shallower depth of the epicenter, this earthquake caused more significant damage to pipelines, traffic facilities, residential houses/properties and multi-story buildings in the central business district than the September 2010 Darfield Earthquake in spite of its smaller earthquake magnitude. Unfortunately, this earthquake resulted in significant number of casualties due to the collapse of multi-story buildings and unreinforced masonry structures in the city center of Christchurch. As of 4 April, 172 casualties were reported and the final death toll is expected to be 181. While it is extremely regrettable that Christchurch suffered a terrible number of victims, civil and geotechnical engineers have this hard-to-find opportunity to learn the response of real ground from two gigantic earthquakes which occurred in less than six months from each other. From geotechnical engineering point of view, it is interesting to discuss the widespread liquefaction in natural sediments, repeated liquefaction within short period and further damage to earth structures which have been damaged in the previous earthquake. Following the earthquake, an intensive geotechnical reconnaissance was conducted to capture evidence and perishable data from this event. The team included the following members: Misko Cubrinovski (University of Canterbury, NZ, Team Leader), Susumu Yasuda (Tokyo Denki University, Japan, JGS Team Leader), Rolando Orense (University of Auckland, NZ), Kohji Tokimatsu (Tokyo Institute of Technology, Japan), Ryosuke Uzuoka (Tokushima University, Japan), Takashi Kiyota (University of Tokyo, Japan), Yasuyo Hosono (Toyohashi University of Technology, Japan) and Suguru Yamada (University of Tokyo, Japan).
The New Zealand Kellogg Rural Leaders Programme develops emerging agribusiness leaders to help shape the future of New Zealand agribusiness and rural affairs. Lincoln University has been involved with this leaders programme since 1979 when it was launched with a grant from the Kellogg Foundation, USA.At 4.35am on 4th September 2010, Canterbury was hit by an earthquake measuring 7.1 on the
Richter scale. On 22nd February 2011 and 13th June 2011 a separate fault line approximately
35km from the first, ruptured to inflict two further earthquakes measuring 6.3 and 6.0
respectively. As a direct result of the February earthquake, 181 people lost their lives. Some
commentators have described this series of earthquakes as the most expensive global
insurance event of all time.
These earthquakes and the more than 7000 associated aftershocks have had a significant
physical impact on parts of Canterbury and virtually none on others. The economic, social and
emotional impacts of these quakes spread across Canterbury and beyond.
Waimakariri district, north of Christchurch, has reflected a similar pattern, with over 1400 houses
requiring rebuild or substantial repair, millions of dollars of damage to infrastructure, and
significant social issues as a result. The physical damage in Waimakiriri District was
predominately in parts of Kaiapoi, and two small beach settlements, The Pines and Kairaki
Beach with pockets elsewhere in the district. While the balance of the district is largely
physically untouched, the economic, social, and emotional shockwaves have spread across the
district. Waimakariri district consists of two main towns, Rangiora and Kaiapoi, a number of
smaller urban areas and a larger rural area. It is considered mid-size in the New Zealand local
government landscape.
This paper will explore the actions and plans of Waimakiriri District Council (WDC) in the
Emergency Management Recovery programme to provide context to allow a more detailed
examination of the planning processes prior to, and subsequent to the earthquakes. This study
looked at documentation produced by WDC, applicable legislation and New Zealand
Emergency Management resources and other sources. Key managers and elected
representatives in the WOC were interviewed, along with a selection of governmental and nongovernmental
agency representatives. The interview responses enable understanding of how
central Government and other local authorities can benefit from these lessons and apply them
to their own planning.
It is intended that this paper will assist local government organisations in New Zealand to
evaluate their planning processes in light of the events of 2010/11 in Canterbury and the
lessons from WDC.
The timeliness and quality of recovery activities are impacted by the organisation and human resourcing of the physical works. This research addresses the suitability of different resourcing strategies on post-disaster demolition and debris management programmes. This qualitative analysis primarily draws on five international case studies including 2010 Canterbury earthquake, 2009 L’Aquila earthquake, 2009 Samoan Tsunami, 2009 Victorian Bushfires and 2005 Hurricane Katrina. The implementation strategies are divided into two categories: collectively and individually facilitated works. The impacts of the implementation strategies chosen are assessed for all disaster waste management activities including demolition, waste collection, transportation, treatment and waste disposal. The impacts assessed include: timeliness, completeness of projects; and environmental, economic and social impacts. Generally, the case studies demonstrate that detritus waste removal and debris from major repair work is managed at an individual property level. Debris collection, demolition and disposal are generally and most effectively carried out as a collective activity. However, implementation strategies are affected by contextual factors (such as funding and legal constraints) and the nature of the disaster waste (degree of hazardous waste, geographical spread of waste etc.) and need to be designed accordingly. Community involvement in recovery activities such as demolition and debris removal is shown to contribute positively to psychosocial recovery.