A photograph of a barbeque brunch and public talk opposite the former Christchurch City Council offices on Tuam Street. The design team from Sustainable Habitat Challenge discussed the build of a sub-consent, off-grid office for Life in Vacant Spaces Trust. The event was part of FESTA 2012.
A photograph captioned by BeckerFraserPhotos, "MSC House at 92 Lichfield Street which has sustained further damage during the 23 December 2011 aftershock".
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. After nearly five years of 'Emergency Response' where sustainability has been sacrificed in the interests of speed, we can assume that this phase is now behind us. We see no reason why this period should be extended until April 2016. Lessons must be learned from the past. It is time to move into the 'Restoration Phase'. Once seismic and building standards are corrected, and risks are notified, mapped and accepted, sustainability will be ensures. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents. We support option 3+."
An image used in email invitations to a seminar featuring international speaker Charles Montgomery. Montgomery is well known for his book on sustainable and wellbeing-centric urbanism, Happy City, which was the theme of his talk. The invitation provides information about the speaker and the event.
A digital copy of a poster from the Te Waioratanga project of the All Right? campaign. The poster features a black and white photographic portrait of kapa haka practitioner Te Mairiki Williams with his twins Ruruhira (left) and Te Kotuku (right). The caption reads, "Embrace the epitome of 'aukati'. Auahi, waipiro, taru, patu kore. To prolong and sustain life".
A photograph looking east down Gloucester Street from near the Manchester Street intersection. Members of the Wellington Emergency Management Office Emergency Response Team and construction workers are walking down the street. To their right is the new Press House building with many broken windows. In the foreground, the Coachman building has sustained earthquake damage to the façade. Wire fences have been placed around the building as a cordon.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Seismic Risk. One thing we can learn from the past is that seismic risk in Canterbury has been underestimated before the earthquakes struck. This is confirmed in a report for EQC in 1991 (paper 2005). It is also the conclusion of the Royal Commission in the CTV report. A number of recommendations have been made but not followed. For example, neither the AS/NZS 1170.5 standard nor the New Zealand Geotechnical Society guidelines have been updated. Yet another recovery instrument is the Earthquake Prone Building Act, which is still to be passed by Parliament. As the emergency response part of the recovery is now behind us, we need to ensure sustainability for what lies ahead. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents."