One landscape colour digital photograph taken on 28 April 2012 looking south from Cunningham Terrace, Lyttelton. The foreground of the photograph shows a blue temporary water supply pipe and markings spray painted on the footpath in preparation for repair work. The fence has a home made sign painted with the Fulton Hogan (FH) logo satirized to ...
One landscape colour digital photograph taken on 25 February 2011 showing the temporary water tank installed on the grassy [local name for Lyttelton Main School Field] to provide drinking water for residents to collect when there was no town supply water. A temporary source of drinking water was needed following the 22 February 2011 earthquake...
Photographs of central Christchurch after the 2010-2012 earthquakes taken 25 February 2012 by Sean McMahon. Locations are chiefly Manchester, Saint Asaph, Cashel, Columbo and Lichfield Streets, and the Bridge of Remembrance. Images show fencing around areas closed to the public, damaged and collapsed commercial buildings, cleared sites, re-opened Cashel Street area with shops and a cafe. Source of title - Title supplied by Library Quantity: 34 digital photograph(s).
Christ Church Cathedral, Christchurch, with spire being rebuilt after the 1901 earthquake. Photographer unidentified. The nave, tower and spire of Christchurch Cathedral was completed in 1881. Work on completeing the rest of the building began in 1900. In 1902 the transcepts were finished and work started on the chancel and apse. An earthquake in 1901 cracked the upper part of the spire in two places. In this photograph which dates from late 1902/1903 (see scaffolding beyond the transcept indicating work on chancel) the upper part of the spire has been removed by Messrs Graham and Greig in preparation for replacing this section with a copper covered wooden structure. The Cathedral was completed in 1904. (Information from "Vision and Reality; Christchurch Cathedral in the Square," Colin Brown, Christchurch, 2000 and "A Dream of Spires," Ian Lochhead, Canterbury University Press, 1999, page 153.) Preparation for erecting the scaffolding was reported in the Christchurch Star 15 January 1902. The cross was replaced on the top of the new copper covered wooden section of the spire on 29 June 1903. Source of descriptive information - Notes on file print. Source of title - Title supplied by Library Quantity: 1 b&w original negative(s). Physical Description: Glass negative