The Harbourlight Theatre on London Street in Lyttelton. There is cracking along the side of the building and damage to the domes on top of the towers. Bracing has been placed at the top to limit further damage and to stop debris from falling on the road.
The bell inside the Cathedral tower, which had no structural damage after the 4 September earthquake.
Structural damage to St Elmo Courts with diagonal cracks between the windows of the building. These cracks show that there has been rocking of the masonry piers which means there is no vertical reinforcement provided in the walls.
St Elmo Courts, a NZHPT heritage building on the corner of Hereford and Montreal Streets. The building was severely damaged during the 4 September earthquake, with diagonal cracking between the windows. Scaffolding has been placed around the bottom of the building.
Colour photograph of the north side of St. Elmo's Courts after the 4 September 2010 earthquake, during which it suffered extensive structural damage.
This beautiful building on Madras Street may be condemned after suffering serious structural damage in the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.
Photograph captioned by Fairfax, "Aftermath of the earthquake in Christchurch where the cleanup has begun. Chris Piper in his family's St Martins ruined house where structural damage has probably written it off".
Red stickered door means that this pub on Madras Street is no-go due to structural damage suffered in the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
Efforts are being made to shore up and strengthen this building (corner of Hereford Street / Manchester Street) to save it from demolition after it suffered structural damage in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Efforts are being made to shore up and strengthen this building (corner of Hereford Street / Manchester Street) to save it from demolition after it suffered structural damage in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Cracks have ripped through external columns of this 7 storey building (corner of Hereford Street / Manchester Street), and efforts are being made to shore up and strengthen it to save it from demolition after it suffered structural damage in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Cracks have ripped through external columns of this 7 storey building (corner of Hereford Street / Manchester Street), and efforts are being made to shore up and strengthen it to save it from demolition after it suffered structural damage in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Cracks have ripped through external columns of this 7 storey building (corner of Hereford Street / Manchester Street), and efforts are being made to shore up and strengthen it to save it from demolition after it suffered structural damage in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.