A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. After nearly five years of 'Emergency Response' where sustainability has been sacrificed in the interests of speed, we can assume that this phase is now behind us. We see no reason why this period should be extended until April 2016. Lessons must be learned from the past. It is time to move into the 'Restoration Phase'. Once seismic and building standards are corrected, and risks are notified, mapped and accepted, sustainability will be ensures. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents. We support option 3+."
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission. CERA Draft Transition Recovery Plan. 5. In your opinion, is there a better way to report on these recovery issues? We believe that, as regards residential recovery, monitoring should extend to code compliance certificates. According to figures published in 2014, only factions of repairs/rebuilds are completed with the issue of a code compliance certificate. To conclude the work to the required standard, someone must pay for the code compliance. Leaving things as they are could have serious negative consequences for the recovery and for the city as a whole. We suggest an investigation of number of outstanding code compliance certificates and that responsible parties are made to address this outstanding work. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents."
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Seismic Risk. One thing we can learn from the past is that seismic risk in Canterbury has been underestimated before the earthquakes struck. This is confirmed in a report for EQC in 1991 (paper 2005). It is also the conclusion of the Royal Commission in the CTV report. A number of recommendations have been made but not followed. For example, neither the AS/NZS 1170.5 standard nor the New Zealand Geotechnical Society guidelines have been updated. Yet another recovery instrument is the Earthquake Prone Building Act, which is still to be passed by Parliament. As the emergency response part of the recovery is now behind us, we need to ensure sustainability for what lies ahead. We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable residents."