The damaged Cranmer Courts on the corner of Kilmore and Montreal Streets. The corner of the building has crumbled onto the street, which is now littered with broken masonry. Wire fencing placed around the building after the 4 September 2010 earthquake has managed to keep the debris away from the road.
A partially constructed tilt slab building on a site in the Christchurch central city.
Photograph captioned by BeckerFraserPhotos, "New construction, Victoria Street".
A damaged building on the corner of Montreal and Armagh Streets, near Cranmer Square. To the right, a new tilt-slab building is being constructed on the site of a demolished building and the damaged Cranmer Centre can be seen.
Damage to the Lyttelton Port. A concrete slab has lifted, breaking the asphalt.
A partially constructed tilt slab building on a site in the Christchurch central city.
A large crack in the concrete floor slab of a building in Barbadoes Street. The photographer comments, "This is a picture of the cracked concrete floor in a shop in the Christchurch CBD. I have a similar crack in my home, but I have not lifted the carpet to look".
Damage to the Lyttelton Port. A concrete slab has lifted and broken at the edge.
Photograph captioned by BeckerFraserPhotos, "Subsidence under a concrete slab on St. David's Street, Lyttelton".
A partly constructed tilt slab building on the demolition site of 338 Montreal Street. In the background, a severely damaged B&B can be seen.
A partly constructed tilt slab building on the demolition site of 338 Montreal Street. In the background, a severely damaged B&B can be seen.
Damage to the Lyttelton Port. A concrete slab has separated from the pavement. A crack has opened up and bricks at the edge are falling in.
The driveway of a property on Avonside Drive. The slabs of concrete that make up the driveway have shifted and cracked, and weeds have grown up between them.
Workers inspecting the badly damaged Redcliffs Scout Hall. Large concrete slabs have fallen inwards from one wall. The photographer comments, "This building was badly damaged in the February quake but now close to collapse".
Photograph captioned by BeckerFraserPhotos, "25 Seabreeze Close, Bexley. View through the window shows the crack in the floor slab, and a pile of silt in the corner of the room".
A view down the driveway of a property on Avonside Drive to its garage. The slabs of concrete that make up the driveway have all visibly shifted, and the garage is on a lean.
The Windsor Hotel, on the corner of Montreal Street and Armagh Street. The building was red-stickered after the September 2010 earthquake and demolished after the February 2011 earthquake. Beside the hotel, construction has begun on a modern, tilt-slab building.
A large crack between the road and a concrete slab in New Brighton. The photographer comments, "This is the gap that has been growing during all the Christchurch earthquakes. It is between Robbie's Restaurant and the car park in New Brighton".
A concrete slab blocking access to the Medway Street footbridge. The footbridge was badly warped in the 4 September 2010 earthquake. Someone has spray painted graffiti on the concrete block. Behind the concrete is a section of safety fence further blocking access.
A photograph of some simple street art on a concrete wall. The artwork depicts a masked boy with red hair, nestled between the colourful letters of tag writing. An excavator from Mount Grey Downs Limited and some stacked concrete slabs are in the foreground.
A broken concrete floor slab in a residential property. The photographer comments, "Now that our house is to be rebuilt some time in the distant future, I decided to relay the loose and broken tiles. I took some photos to show what lies beneath".
Text reads 'Earthquake survivors' and amongst the rubble of a collapsed building is a man representing 'courage' who is trapped by a concrete slab and a woman with severed legs who is reaching out to help him and who represents 'compassion'. Context - The very severe Christchurch earthquake of 22 February 2011 in which probably more than 200 people died and an enormous amount of structural damage has been done.
Quantity: 1 digital cartoon(s).