A damaged chimney on the roof of a house in Kaiapoi. The bricks have crumbled onto the roof where they lie precariously. These will have to be removed and the rest of the chimney deconstructed by hand.
Photograph captioned by BeckerFraserPhotos, "Kaiapoi".
A photograph of an empty site and badly-damaged buildings, taken from behind a fence on Madras Street. In the distance is the old Post Office building.
A photograph of an empty site and badly-damaged buildings taken from behind a fence on Madras Street. In the distance is the old Post Office building.
A photograph of an empty site on the corner of Tuam Street and Madras Street. In the distance is the old Post Office building.
File reference: CCL-2012-02-19-IMG_0262
From the collection of Christchurch City Libraries.
Photograph captioned by BeckerFraserPhotos, "The demolition site of the former Sydenham Post Office".
Photograph captioned by BeckerFraserPhotos, "The demolition site of the former Sydenham Post Office".
A photograph of an empty site and badly-damaged buildings taken from behind a fence on Madras Street. In the distance is the old Post Office building.
A photograph of an empty site and badly-damaged buildings taken from behind a fence on Madras Street. In the distance is the old Post Office building.
A close-up photograph of a wire fence on Madras Street. In the distance is the old Post Office building.
Photograph captioned by BeckerFraserPhotos, "The Environment Canterbury Emergency Management Office".
Photograph captioned by BeckerFraserPhotos, "The Environment Canterbury Emergency Management Office".
Photograph captioned by BeckerFraserPhotos, "The Environment Canterbury Emergency Management Office".
A photograph of a barbeque brunch and public talk opposite the former Christchurch City Council offices on Tuam Street. The design team from Sustainable Habitat Challenge discussed the build of a sub-consent, off-grid office for Life in Vacant Spaces Trust. The event was part of FESTA 2012.
The finished 10m2 office building, soon to be the Gap Filler Headquarters in Sydenham.
Recycled metal sheets nailed to the sides of the 10m2 office building for insulation.
Hawkins Construction site office on Creyke Road.
Photograph captioned by BeckerFraserPhotos, "Historic Post Office in Cathedral Square from the site of the Regent Theatre (telephoto lens used)".
Coffee Zone, a cafe in a shack next to the 10m2 office building in Sydenham.
The finished 10m2 office building, now the Gap Filler Headquarters, with the Coffee Zone shack in the background.
A photograph of a partially-cleared building site and badly-damaged buildings between St Asaph Street and High Street, taken from St Asaph Street. The old post office building can be seen in the distance.
A photograph of a presentation about the EPIC centre during a tour of the building. The tour was conducted as part of FESTA 2012.
A photograph of a presentation about the EPIC centre during a tour of the building. The tour was conducted as part of FESTA 2012.
A photograph of a presentation about the EPIC centre during a tour of the building. The tour was conducted as part of FESTA 2012.
Photograph captioned by BeckerFraserPhotos, "The new Press building on Gloucester Street at dusk. The central city red zone now has office workers and lights on".
Photograph captioned by BeckerFraserPhotos, "The Old Post Office in Cathedral Square with the Telecom exchange building behind, and Clarendon Tower under demolition".
Members of Gap Filler and volunteers posing for a photograph in front of the half complete 10m2 office building in Sydenham.
Workers nail recycled metal sheets to the outside of the 10m2 office building, soon to be Gap Filler's Headquarters.
Workers nail recycled metal sheets to the outside of the 10m2 office building, soon to be Gap Filler's Headquarters.