Knox Church earthquake repair/rebuild on a walk around Christchurch December 11, 2013 New Zealand. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... All about our ear...
The information board for the Riccarton House earthquake repairs and strengthening project.
Information board and hazard notices for the Riccarton House earthquake repairs and strengthening project.
An aerial photograph looking south over the Arts Centre on Worcester Boulevard. Scaffolding and cranes can be seen around the building which is having extensive repairs done to it after the earthquakes.
Sewer repairs due to earthquake damage have our street totally closed off apart from pedestrian traffic down the footpath.
20130211_2645_1D3-840 South New Brighton bridge damage (under repair) Earthquake damage (that right hand abutment should be vertical with the bridge and the hand rail level). Bridge is closed to eastbound traffic (to left) and has a 3500kg weight limit as well. The eastern approach is the same. Damage caused mainly in the 04/09/10 and 22/02/11...
20130817_2457_1D3-400 The story of Christchurch (Day 229/365) Many roads are closed all over eastern Christchurch as infra-structure repairs are carried out, whether it be water supplies, sewer repairs (as is the case here) or general road repairs, In just over two weeks it will be three years since the first earthquake happened (4th September...
One landscape colour digital photograph taken on 26 May 2013 on the corner of Norwich Quay and Canterbury Street, Lyttelton. The photograph shows the sites of the Royal Hotel, Shadbolt House, and the Lyttelton Hotel along Norwich Quay. The Wunderbar and the repair and strengthening work underway on the Lyttelton Working Mens Club/The Loons are v...
A signpost pointing 'West' and 'East'. The sign pointing West is intact; that indicating East is broken and barely hanging on to the post. Refers to the condition of Christchurch City after the earthquakes of 2010 and 2011; the western wealthier suburbs were less damaged than the poorer Eastern suburbs. Also, progress on repair and rehabilitation of eastern housing had been slow. The redesign of the city centre seemed to be a western suburb priority which ignored the poverty and misery of living conditions on the east. Quantity: 1 digital cartoon(s).
Shows a group of snails working on the rebuild of Christchurch. Refers to the slow pace of recovery after February 2011 earthquake in Canterbury. Quantity: 1 digital cartoon(s).
Still awaiting a repair, but with so many bridges closed or partially closed we are lucky this one had what maybe minor damage.
The damaged (and once iconic Christchurch Cathedral) waits it's fate (repaired or demolish/rebuild) with the Millenium hotel in background.
The earthquake re-pair work has started on the Knox Church on Bealey Avenue, August 14, 2013 Christchurch New Zealand. While building after building is torn down in Christchurch, plans are in place to ensure as much of a 131-year-old church is retained as possible. Knox Church on Bealey Avenue suffered major damage in the February 22 earthquak...
The NG building on Madras Street was given the go ahead to repair earthquake damage, which the owners did at some expense, Now, the government want this land to build a central city stadium, so there is a protest on the windows set to the Christmas song the Twelve Days of Christmas. 12 million road cones 11 thousand Hi-Viz (vests) 10 Council m...
The NG building on Madras Street was given the go ahead to repair earthquake damage, which the owners did at some expense, Now, the government want this land to build a central city stadium, so there is a protest on the windows set to the Christmas song the Twelve Days of Christmas. 12 million road cones 11 thousand Hi-Viz (vests) 10 Council m...
Shows a sick and damaged Christchurch Anglican Cathedral in a hospital bed with two attendants. The Cathedral asks 'Can ya just pull the plug and let me die peacefully?'. Context refers to recent comments by Bishop Victoria Matthews that the Christchurch Cathedral is 'being left to die with no dignity' because of ongoing legal battles about its future. There has been ongoing debate and controversy over whether the Cathedral should be demolished, reconstructed or restored following damage suffered in the February 2011 Earthquake. Quantity: 1 digital cartoon(s).
Only it is worse this time! As from Wednesday I won't have car access to the property, nor the street, nor one of the neighbouring streets - for a month at least! A second attempt to do a sewer repair after the earthquakes - yes I know they were 3 to 2½ years ago!
While the whole of the North Island is under drought conditions and parts of the South Island likely to follow suit, I doubt it will happen in Christchurch. With hundreds of earthquake road, water and sewer repairs underway many are spilling hundreds of litres of water per minute, like this one outside my house. It has been running like this fo...