A man stands on a wooden deck. There is a visible gap between the steps and the lower decking. The photographer comments, "Decks and steps have separated".
Workers constructing a deck between the temporary classrooms on the Ilam Oval.
Workers constructing a deck between the temporary classrooms on the Ilam Oval.
Workers constructing a deck between the temporary classrooms on the Ilam Oval.
Wood all wrapped up and ready to be made into decks at the College of Education.
A deck which is now suspended over empty space at the edge of the cliff in Sumner.
The cracked foundations of a house on Charles Street in Kaiapoi. Planks have been removed from the front decking to allow access to the foundations.
A view through a safety fence to the damaged Bridge Tavern in Kaiapoi. Severe cracks in the building's foundations can be seen, and the front decking has sagged.
A photograph captioned by BeckerFraserPhotos, "A house at 464 Avonside Drive in Avonside which has moved towards the river while the deck stayed put".
Photograph captioned by BeckerFraserPhotos, "Otakaro Place, Bexley. A great hole has opened up between the deck and the garden with fissures all over the garden".
Taken during a scenic flight over Christchurch, New Zealand, 3 months after the deadly earthquake of 22 February, 2011.
Much of the inner city CBD is still cordoned off and will be for some time. About 900 buildings are set for demolition.
Taken aboard the Southern DC3
www.so...