Latimer Hotel, Latimer Square, Christchurch
File reference:
CCL-2012-04-06-LatimerSquare-April-2012-DSC_0861.JPG
From the collection of Christchurch City Libraries.
Photograph captioned by BeckerFraserPhotos, "New construction starts at 75 Manchester Street".
Construction work seen from Gloucester Street.
Looking through the fence of a construction site where some ground foundation has been laid down. The heading on the sign on the fence says 'Caution. Construction Site. Authorised Personnel Only'.
Hawkins Construction site office on Creyke Road.
A photograph of a Leighs Construction sign on Manchester Street.
Volunteers tying down cables during the construction of the Pallet Pavilion.
A digitally manipulated image of diggers sitting on top of rubble beside the old Railway Station. The photographer comments, "Which one will be buried 6 foot under?".
Building construction in Edgeware. This will soon house a SuperValue supermarket.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
A photograph of construction equipment displayed in a shipping container on Oxford Terrace.
Volunteers standing on top of pallets during the construction of the Pallet Pavilion.
Photograph captioned by BeckerFraserPhotos, "The EPIC construction office, 100 Manchester Street".
A construction area on Kilmore Street with a pile of rubble behind cordon fencing.
Decoration on the cordon fence. Ongoing construction work can be seen in the background.
A photograph of a partially-constructed building. The photograph is captioned by BeckerFraserPhotos, "Rebuilding, Salisbury Street".
A photograph captioned by BeckerFraserPhotos, "Workers laying a new footpath outside 540 Colombo Street".
A photograph captioned by BeckerFraserPhotos, "A new front being built on 514 Colombo Street".
A photograph of a concrete mixer. The photograph is captioned by BeckerFraserPhotos, "The old and the new in Colombo Street".
A photograph captioned by BeckerFraserPhotos, "The new car park on Colombo Street between Tuam and Lichfield Streets, with flower beds and new trees".
A photograph captioned by BeckerFraserPhotos, "Concrete being poured in a new building in Colombo Street".
A photograph captioned by BeckerFraserPhotos, "A de-construction worker on the MFL House site".
Looking towards the Christchurch CBD, with road cones, cranes and buildings being construction in the background.
A photograph captioned by BeckerFraserPhotos, "Crowne Plaza Hotel in the process of de-construction".
A volunteer posing in his kilt on St Andrew's Day, during the construction of the Pallet Pavilion.
A photograph of the site of the Crowne Plaza Hotel on the corner of Kilmore and Durham Streets. The hotel has been demolished into large piles of rubble which two excavators are working to clear. A sign on the cordon fence indicates that the demolition is being carried out by Grant Mackay Demolition Co. and Leigh Construction.
Photograph captioned by BeckerFraserPhotos, "New construction of residential units at the Linwood Village, 402 Worcester Street".
A photograph captioned by BeckerFraserPhotos, "Brick cladding covering up concrete slab - strong and attractive! Montreal Street".
A photograph of the EPIC Innovation Centre under construction on the corner of St Asaph Street and Manchester Street.