Construction workers remove stones from the damaged Arts Centre.
Latimer Hotel, Latimer Square, Christchurch
File reference:
CCL-2012-04-06-LatimerSquare-April-2012-DSC_0861.JPG
From the collection of Christchurch City Libraries.
Photograph captioned by BeckerFraserPhotos, "New construction starts at 75 Manchester Street".
Photograph captioned by BeckerFraserPhotos, "New construction at 39 Conference Street".
An aerial photograph of Kilmore Street with a new medical facility under construction.
A photograph of the Transitional Cathedral under construction on the corner of Latimer Square and Hereford Street.
A photograph of a construction site near the intersection of Black Street and Raven Quay in Kaiapoi.
A photograph looking north-west along Raven Quay in Kaiapoi. The road is unsealed and the intersection with Black Street is undergoing construction.
The Kaiapoi New World construction site.
The Kaiapoi New World construction site.
A photograph captioned by BeckerFraserPhotos, "New construction on the corner of Colombo and Kilmore Streets".
A photograph captioned by BeckerFraserPhotos, "Josh Worthington standing next to a Worthing Construction truck on Woodham Road. Josh owns Worthington Contracting with his brother".
A photograph captioned by BeckerFraserPhotos, "The construction of a new building on the corner of Colombo and Kilmore Streets".
A photograph of a new construction on Victoria Street.
A photograph of construction workers and members of the Wellington Emergency Management Office Emergency Response Team walking down Gloucester Street towards Durham Street.
Construction has begun on the "cardboard cathedral" in Latimer Square.
Photograph captioned by BeckerFraserPhotos, "New construction, Victoria Street".
A photograph of a building under construction on Victoria Street.
A photograph of a Leighs Construction sign on Manchester Street.
A photograph of a building under construction on Victoria Street.
A photograph of a building under construction on Victoria Street.
A photograph of a building under construction on Victoria Street.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. Construction material has been laid up against the mural.
Volunteers tying down cables during the construction of the Pallet Pavilion.
A photograph of Leighs Construction hoarding on the corner of Hereford Street and Colombo Street. The hoarding features an image from the All Right? campaign, promoting the 'Five Ways To Wellbeing.
Volunteers drilling holes in pallets during the construction of the Pallet Pavilion.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. Sections of reinforcing steel and other construction material have been laid up against the mural.
A photograph of a member of the Wellington Emergency Management Office Emergency Response Team walking down Gloucester Street towards Colombo Street. In the distance, a group of construction workers are walking down the street.
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. A skip, several pallets, and other construction material have been placed in front of the mural.
A photograph of a large All Right? banner being installed on a Leighs Construction hoarding. All Right? posted the photograph on their Facebook page on 18 February 2014 at 4:51pm.