Photograph captioned by BeckerFraserPhotos, "128 -142 Armagh Street".
Photograph captioned by BeckerFraserPhotos, "TV camera crew heading towards Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "128 - 134 Armagh Street - Kens Camera and Video".
A photograph of an abandoned camera tripod and Buzzy Bee toy in Cathedral Square.
Photograph captioned by BeckerFraserPhotos, "128 - 134 Armagh Street - Kens Camera and Video".
Photograph captioned by BeckerFraserPhotos, "Ross the documentary photographer ready for the red zone. Gloucester Street".
Photograph captioned by BeckerFraserPhotos, "Ross Becker ready to go flying. Three cameras with different lenses and his GPS unit".
Quake Day makes the camera go a bit od - but everyone loves a grid.
PWS-2010-09-04-DSC01720
A photograph captioned by BeckerFraserPhotos, "Drainage worker monitoring what the robotic camera sees as it moves along the drain beneath Kirsten Place in New Brighton".
A girl walks across the Gap Filler "Dance-o-mat" dance floor in Re:Start mall. The photographer comments, "She was dancing, but when she saw my camera she got shy and ran back to her friends".
Students from Avonside Girls High School giving BeckerFraserPhotos the thumbs up. The photograph has been captioned by BeckerFraserPhotos, "Once these girls noticed the large camera, we got an enthusiastic reaction from them".
A photograph of the earthquake-damaged Observatory tower at the Christchurch Arts Centre. The photograph was taken using a cellphone camera. The top of the tower collapsed during the 22 February 2011 earthquake. The rubble from the tower has been cleared and a tarpaulin has been placed over the top of the broken tower. Tyres have been placed on the tarpaulin to hold it down. A temporary roof has also been constructed over the tower to keep out the rain.
A photograph of the earthquake-damaged Observatory tower at the Christchurch Arts Centre. The photograph was taken using a cellphone camera. The top of the tower collapsed during the 22 February 2011 earthquake. The rubble from the tower has been cleared and a tarpaulin has been placed over the top of the broken tower. Tyres have been placed on the tarpaulin to hold it down. A temporary roof has also been constructed over the tower to keep out the rain. Two vehicles are parked in front.